A machine maintenance checklist lists the inspections, lubrication, cleaning and adjustments each machine needs, grouped by how often they are due. This guide gives you a general checklist for shop and production machines, a CNC machine maintenance checklist drawn from a machine builder’s published schedule, and the fields a machine maintenance log should record.
Free tool: Feeds and speeds calculator (SFM, RPM, feed rate): Spindle RPM from SFM and diameter, feed rate from chip load, and starting speeds for common metals.
What a machine maintenance checklist should cover
Lathes, mills, grinders, presses, saws, compressors, conveyors and packaging machines differ in the details, but their checklists draw on the same systems. Build one checklist per machine model, start from the manufacturer’s manual, and add items when a failure shows you something the manual missed.
Split the list by who does it. Operators take the short daily checks at shift start and end, because they are at the machine anyway. Maintenance technicians take anything that needs tools, lockout or test equipment. Put the two groups on separate sections of the sheet so an operator never has to guess whether an item is theirs.
- Lubrication: oil levels, way lube and spindle lube reservoirs, grease points, automatic lubricator operation
- Fluids and filters: coolant level and concentration, hydraulic oil, air filters, coolant and hydraulic filters
- Air and hydraulics: regulator pressure, water in air lines, hoses and fittings for cracks and leaks
- Mechanical: belts, couplings, bearings (noise, heat), ways and wipers, tool changers, chucks and fixtures
- Electrical: cabinet filters and fans, loose connections, damaged cables, ground connections
- Safety: guards in place, door interlocks, emergency stops, windows, light curtains
Machine maintenance schedule by frequency
Use this general schedule as a template, then replace each interval with the one in your manual. Where a machine has an hour meter, set the service intervals in run hours; calendar intervals suit machines that sit idle for weeks.
- Start of shift: check lube and coolant levels, drain water from air lines, confirm air pressure, test the emergency stop and door interlock, look for leaks under the machine
- End of shift: clear chips and swarf, wipe ways and covers, empty chip trays, note any noise or alarm on the log
- Weekly: check coolant concentration and skim tramp oil, clean coolant filters and screens, inspect hoses, check belt tension, verify regulator readings match the control
- Monthly: check lube reservoirs and refill, grease fittings that call for it, clean electrical cabinet filters and fans, inspect wipers and way covers
- Every six months: change coolant and clean the tank, replace filters due by time, inspect all hoses for cracking, test the lubrication system, check probe batteries and calibration
- Annually: check level and alignment, measure backlash or spindle runout if your shop tracks it, replace gearbox or hydraulic oil if the manual calls for it, review the machine’s failure history
CNC machine maintenance checklist
Haas Automation publishes maintenance checklists and schedules for its mills and lathes, and the items below follow them. Other builders publish their own lists, so check yours for differences in intervals and lubricants.
Haas’s weekly mill checklist starts each morning with a spindle warm-up program, draining water from the air lines with the air gun, and checking coolant level, air pressure and coolant concentration with a refractometer against the coolant maker’s specification. Daily, operators check tool holders, pull studs and tool tapers for damage. At the end of the shift they clear chips from the way covers and the chip filter on the coolant tank, and if the machine will sit, clean and protect the spindle taper with a rust inhibitor.
At the end of the week the list adds the tool changer (chip buildup, sticky plungers, worn keys), the lube panel’s air regulator gauge, the coolant float gauge, tramp oil on the coolant surface and chips in the coolant filter. Haas’s toolroom mill schedule shows the longer intervals: windows and door interlock daily, axis lube reservoir and way covers monthly, a full coolant tank clean and coolant change every six months along with lubrication tests and hose inspections, and spindle drawbar force measured once a year.
Safety rules that shape the checklist
OSHA 29 CFR 1910.212 requires machine guarding to protect operators and others in the machine area from hazards such as the point of operation, ingoing nip points, rotating parts, flying chips and sparks. It lists milling machines, power presses and power saws among the machines that usually need point-of-operation guarding. A daily guard check belongs on the operator’s part of the checklist.
When maintenance means removing a guard or reaching into the danger zone, OSHA’s lockout/tagout standard, 29 CFR 1910.147, applies to the servicing. Minor tool changes and adjustments that are routine, repetitive and integral to production are excepted when other measures give effective protection. Mark on each checklist item whether it needs lockout, so a technician does not have to decide at the machine.
What to record in a machine maintenance log
A machine maintenance log is the running history of every check, service and repair on one machine. Keep one log per machine, filled in when the work is done. Months later, you use it to work out why a spindle failed or whether a warranty claim holds.
A hypothetical entry for a vertical mill might read: 14 March, 6,212 run hours, weekly check. Coolant at 6.5% on the refractometer against a 7 to 9% target, topped up with concentrate and rechecked at 8%. Tramp oil skimmed, chip filter cleaned, tool changer plungers wiped. Ten minutes of downtime, initials JR. The concentration readings are the part worth keeping: a run of low numbers points at a leak or a mixing problem long before the tools show it.
- Machine ID, make, model and serial number
- Date, and run hours or cycle count if the machine has a meter
- Type of work: daily check, scheduled service, repair or inspection
- What was done, and readings taken (coolant concentration, pressure, temperature)
- Parts and fluids used, with quantities
- Problem, cause and fix for repairs
- Time spent and downtime
- Name or initials of the person who did the work
Turning the checklist into a working schedule
Put the schedule where people will see it. A laminated sheet on the machine works for daily operator checks; anything weekly or longer needs a list with due dates that someone owns, or it slides when production is busy. Keep a small stock of the filters, wipers and belts each machine uses so a scheduled job does not wait on parts.
Review the log every quarter. If the same failure shows up twice, add a check for it to the list or shorten the interval. If a task has never found a problem in two years on a non-critical machine, you can stretch it and spend the time elsewhere.
Machine checklists and logs in FleetZap
FleetZap is cloud maintenance software that runs in a browser and on any phone browser. You build each checklist as a procedure, and a step can be a reading with minimum and maximum limits, so a coolant concentration outside its range counts as a fail and opens one repair work order linked to the inspection. Preventive schedules open the work order with that procedure attached, by run hours or by calendar.
Each machine’s record becomes its maintenance log: every job, status change, meter reading, part and cost, with problem, cause and remedy codes on repairs. Each machine also lists its spare parts with live stock, so you see what to order before PM comes due. Operators scan the machine’s QR label on a phone to run the daily check or report a problem, and you can print any procedure as a clean SOP for the machine.
Key takeaways
- If an item needs a tool, a meter or a guard removed, it belongs on the technician list, whatever its frequency.
- Run-hour intervals suit machines that run several shifts; calendar intervals suit machines that sit for weeks. Haas sets its coolant change by the calendar (every six months), so leave that one on dates.
- Write the target range next to every reading on the sheet, so the person taking it knows on the spot whether it failed.
- Stretch an interval only on non-critical machines, one step at a time, and note the change in the log so the next failure can be traced to it.
Free tools for this
- Feeds and speeds calculator (SFM, RPM, feed rate): Spindle RPM from SFM and diameter, feed rate from chip load, and starting speeds for common metals
- Drill size chart (number, letter, fraction): Number, letter and fractional drill sizes in inches and mm, and a closest-drill finder
- Fraction to decimal and mm chart: Every 64th of an inch as a decimal and in mm, and back to a fraction
- Equipment total cost of ownership calculator: Purchase, financing, fuel, repairs and downtime over a machine’s life, minus resale
Sources
FleetZap Maintenance
Work orders, PM, parts, compliance, assets and KPIs. Explore FleetZap Maintenance.
Frequently asked questions
What is a machine maintenance checklist?
A machine maintenance checklist is a list of the inspection, lubrication, cleaning and adjustment tasks a machine needs, grouped by frequency such as start of shift, weekly, monthly and annually. Each item names what to check and what a good result looks like. Operators and technicians tick items off and sign, which leaves a dated record.
What should be on a CNC machine maintenance checklist?
A CNC machine maintenance checklist covers spindle warm-up, coolant level and concentration, air pressure and water in air lines, tool holders and pull studs, chip removal, way covers, lube reservoirs, the tool changer, door interlocks and windows. Longer intervals add coolant tank cleaning, hose inspection, lubrication system tests and drawbar force checks. Follow your builder’s schedule.
How do I make a machine maintenance schedule?
List every machine, then pull the service intervals from each manual into one table with columns for task, interval in hours or days, who does it, and next due date. Add operator checks for each shift. Review the schedule against your repair history every quarter and shorten intervals where the same failure keeps coming back.
What goes in a machine maintenance log?
A machine maintenance log records, for each entry, the date, run hours, type of work, what was done, readings taken, parts and fluids used, time spent, downtime and who did it. For repairs, add the problem, the cause and the fix. Keep one log per machine so you can read its full history.
How often should machines be serviced?
Follow the manufacturer’s manual for each machine. As a pattern, operators check fluids, air and safety devices every shift, technicians handle filters, coolant and belts weekly to monthly, and fluid changes, lubrication tests and alignment checks fall every six to twelve months. Machines running multiple shifts reach run-hour intervals sooner than calendar ones suggest.