FleetZap · Features · Solutions · FleetZap Maintenance · FleetZap Rentals · FleetZap Dispatch · FleetZap GPS Tracking · What a CMMS does · GPS tracking & engine hours · Dispatch & route optimization · Rentals module · Industries · Customers · Resources · Free calculators · Free templates · Pricing · Contact

Maintenance software for paving contractors

Updated

FleetZap gets pavers, rollers and milling machines ready before paving season with planned off-season rebuilds, then tracks daily operator checks and service by engine hours through the season.

Screeds, augers and milling dust

Paving contractors maintain pavers, rollers, milling machines, tack distributors, material transfer vehicles, skid steers and a fleet of dump trucks and lowbeds. Screeds, conveyors, augers and milling teeth are wear parts, and once hot mix is on site, a machine that won’t run means trucks backing up at the paver. Engine hours set the service intervals, and the big jobs happen in the off-season.

Paver wear concentrates in a few places. Screed plates wear thin and the heating elements or burners that keep them hot fail, which shows up as a torn mat. Auger flights and conveyor chains, slats and sprockets wear with every ton, and a broken chain mid-pull stops the paver with mix in the hopper. Milling machines go through cutting teeth and holders fast in hard asphalt and concrete, so crews swap teeth during the day and replace holders when the drum starts to cut unevenly. Rollers need their water spray systems and scrapers working so mix doesn’t stick to the drums. All of those parts have to be on the shelf before the season starts.

Milling also brings a dust rule. OSHA’s construction silica standard (29 CFR 1926.1153) lists drivable milling machines in its Table 1: large machines need exhaust ventilation on the drum enclosure and supplemental water sprays to suppress dust, and the table says to operate and maintain the machine to minimize dust emissions. Clogged spray nozzles, a worn water pump or a torn drum enclosure seal are maintenance items that affect compliance as well as cut quality, so they belong on the daily check.

Breakdowns mid-pour and screed wear parts

  • Short season: Pavers, rollers and mills all have to be rebuilt and checked before the first pour of spring.
  • Breakdowns during a pour: A failure with hot mix on site wastes material and the crew’s day.
  • Wear parts: Milling teeth, screed plates and slat chains have to be on the shelf before they wear through mid-job.
  • Trucks and equipment together: Dump trucks and lowbeds need their own schedules next to the heavy equipment.

Winter rebuilds and spray bar daily checks

  • Off-season preparation: Calendar schedules and checklists for pre-season inspections and rebuilds, planned on the calendar.
  • PM by hours or miles: Pavers and rollers on engine hours, trucks on miles, each with a calendar interval, whichever comes first.
  • Daily checks by QR: Operators complete a pre-use check on their phone, spray bars and screed heat included; a failed item opens a repair.
  • Wear parts in stock: Reorder points, purchase orders and a spare-parts list on each machine.
  • Field repairs: Mechanics work jobs from the field app, logging parts and time on site.
  • Cost per machine: Parts, labor, outside repairs and fuel per machine, with cost per engine hour.

Pavers, rollers, mills, MTVs and lowbeds

  • Asphalt pavers
  • Rollers and compactors
  • Milling machines
  • Material transfer vehicles
  • Tack distributors
  • Skid steers
  • Dump trucks
  • Lowbeds

Paver downtime cost in the paving season

  • Availability: Paver and roller availability before the first pour shows whether winter rebuilds finished on time.
  • Cost per engine hour: Milling machine cost per engine hour includes the teeth; track it per machine so drum wear shows up.
  • PM compliance: If PM compliance drops mid-season, book services on rain days, when crews can’t pave anyway.
  • Downtime cost: Set the paver’s downtime cost high enough to cover the idle crew and the trucks waiting with hot mix.

Free tools for this

Sources

FleetZap Maintenance

Work orders, PM, parts, compliance, assets and KPIs. Explore FleetZap Maintenance.

Frequently asked questions

Can we plan off-season rebuilds?

Yes. Create work orders with estimated hours and procedures, schedule them on the calendar and use the workload board to balance planned hours across your mechanics. You can see in February whether every paver and roller will be rebuilt before the first job.

Can trucks and heavy equipment be in the same system?

Yes. Dump trucks and lowbeds are scheduled by miles and heavy equipment by engine hours, each with their own procedures, all in one account. Reports and cost of ownership work the same way for both, so you can compare a truck and a roller side by side.

How do we keep wear parts in stock?

Each wear part carries a stock level, a reorder point and a preferred vendor. FleetZap suggests reorders grouped by vendor, purchase orders track what’s on the way, and each machine lists the spares it usually needs, such as teeth and holders for a mill, so you can check the shelf against the season’s work.

Can we track downtime cost?

Yes. Set a downtime cost per hour on a machine or its category, and FleetZap prices the time each machine spent down or in service. The dashboard shows downtime cost this month, and reports break it down by machine, which makes the case for a spare screed or a second mill.

Related

Book a demo · Try the live demo