FleetZap · Features · Solutions · FleetZap Maintenance · FleetZap Rentals · FleetZap Dispatch · FleetZap GPS Tracking · What a CMMS does · GPS tracking & engine hours · Dispatch & route optimization · Rentals module · Industries · Customers · Resources · Free calculators · Free templates · Pricing · Contact

The maintenance work order process, step by step

Updated · Reviewed by Israel Margulies, founder and CEO of High Point GPS

The maintenance work order process takes a job from identification to close-out: a problem is reported or a service comes due, the work is approved and planned, assigned and scheduled, carried out, and closed with the time, parts and findings recorded. With an owner at each step, jobs stop going missing, and every closed job adds to the machine’s history.

The six steps

Paper, spreadsheet or software, each job passes through these six steps, and each step needs a named owner. Jobs stall where nobody owns the step, most often at the handoff from one person to the next.

  • Identify (operator, inspector or the PM schedule): a request, inspection finding or preventive service comes due
  • Approve (maintenance manager, supervisor or dispatcher): decide the work is needed and set a priority
  • Plan (planner or lead technician): prepare the procedure, parts and estimated time
  • Schedule and assign (dispatcher): pick a person or team and a due date
  • Do the work (technician): follow the steps, record time and parts
  • Close out (technician, checked by a supervisor): record findings, meter reading and cause, and open any follow-ups

What a good work order contains

Before the work, the order tells the technician which machine, where it is, what is wrong or what service is due, how urgent it is, which procedure to follow and what parts to bring. After the work, it records what the technician found and did, the hours and parts used, the meter reading and any follow-up needed. Every KPI you report and every line of the machine’s history comes from those fields, so a blank cause code today is a gap in next year’s failure analysis.

Handling requests

Many jobs start as a request from an operator, driver or site manager. Make requesting easy, with a phone, a QR code on the machine and a photo, so people report problems while they are small. Someone then reviews each request: approves it into a work order, merges it with a job already open or declines it with a reason. Tell the operator what happened, or they stop reporting.

Closing out properly

Technicians rush close-out at the end of a long job, and the record pays for it. The problem, cause and remedy give you something to analyze later. Actual hours improve the next estimate for the same job. A fresh meter reading keeps preventive schedules on time. If the technician spots a second issue, such as a weeping seal during a brake job, it gets its own follow-up work order; a note in a comment gets lost.

Running work orders in FleetZap

For the first three steps, operators scan the QR label on a machine to send a request with photos, and a request becomes a work order once it is approved. Preventive schedules skip that queue and open their work orders automatically. When a dispatcher schedules and assigns the job, the work order carries its type, priority, due date, assignee and team.

Technicians do the work in the field app on their phones, following the steps, running labor timers and picking parts from inventory; step answers, comments, photos and status changes made without a signal sync when they are back in coverage. At close-out, required steps block closing and a repair asks for problem, cause and remedy codes. A failed inspection step opens a repair of its own, and every closed job adds to the machine’s lifecycle history.

Key takeaways

  • Name an owner for each step; jobs go missing in the handoffs between owners.
  • Decide on requests the same day where you can, and tell the operator the outcome.
  • Open a follow-up job for any extra issue found instead of leaving it in a comment.
  • Rank by safety first, then by what the machine’s downtime costs, then by due date.

Free tools for this

Sources

FleetZap Maintenance

Work orders, PM, parts, compliance, assets and KPIs. Explore FleetZap Maintenance.

Frequently asked questions

What is the difference between a work request and a work order?

A work request is a report that something needs attention, often from an operator or site staff. A work order is approved, assigned work with the details needed to do it. Requests are reviewed, then approved into work orders, merged with existing jobs or declined.

Who should approve work orders?

A maintenance manager, supervisor or dispatcher who can judge priority and crew capacity. Preventive work from an approved schedule needs no second approval. Aim to decide on a request within the day.

What should be recorded when closing a work order?

At minimum: what was done, the labor time, parts used, the machine’s meter reading and its status. For repairs, add the problem, cause and remedy, which is what failure analysis runs on.

How do I prioritize work orders?

Rank safety first, then what the machine’s downtime costs, then the due date. Take a hypothetical Monday with one technician free: a dump truck has a leaking brake line, and the backup loader’s 500-hour service is a week overdue. The brake line goes first, because the truck can’t run safely and a second truck is waiting on it. The loader sits in the yard as a spare, so a few more days late costs little; book it for Tuesday and note the new date on the work order. If the loader were the only machine on a job, it would move ahead of other routine work, but never ahead of the brake line: an unsafe truck stays first.