FleetZap · Features · Solutions · FleetZap Maintenance · FleetZap Rentals · FleetZap Dispatch · FleetZap GPS Tracking · What a CMMS does · GPS tracking & engine hours · Dispatch & route optimization · Rentals module · Industries · Customers · Resources · Free calculators · Free templates · Pricing · Contact

Maintenance software for airport ground support equipment

Updated

FleetZap keeps airport ground support equipment checked and serviced. Ramp agents do daily checks by scanning a QR label, tugs and belt loaders get PM by hours, and every screen shows which units are down.

Short cycles between turnarounds on the ramp

Ground support equipment works in short, frequent cycles around tight turnarounds: tugs and tractors, belt loaders, pushback units, ground power units, air-start and conditioned-air units, deicers, lavatory and water trucks. Crews on different shifts share most units, and service runs on engine hours or calendar intervals set by the manufacturer and the operator’s own program.

Ramp agents notice defects between flights and have a minute or two to report them. A unit tagged out has to show as down to everyone so nobody drives it back to a gate, and the shop needs to know what’s available before the next bank of flights. Electric GSE adds batteries and chargers to the maintenance list.

Anything that touches the aircraft gets the closest attention. Bumpers and rub rails on belt loaders, the front end of a catering or lav truck, and pushback tow bars and their shear pins are checked often, because a worn bumper or a sticking brake near a fuselage can damage the aircraft. Deicers sit most of the year and then work on the first frost morning, so their heaters, pumps, nozzles and booms get a test run before winter. Ground power units need their cables and plugs looked over, since a damaged plug can arc at the aircraft connection. Each of those makes a short reading or pass/fail step on a checklist.

Rushed turnarounds and tagged-out tugs at the gate

  • Tow bars and shear pins: A shear pin is there to break before the nose gear does. A bar refitted with the wrong pin, or a bent bar hung back on the rack, gives no sign of it until the next push.
  • Tagged-out units get used: Without a shared status, a unit waiting for repair can end up back at a gate.
  • Chargers nobody owns: A charger with a damaged cable leaves electric tugs half charged at shift change, and the fault gets written up against the tugs.
  • Units with no meter: Towable GPUs, air-start carts and baggage carts often have no hour meter, and they drop off the plan unless someone puts them on a calendar interval.

Ramp scans, shared down status and battery readings

  • Scan and report: Ramp agents scan the QR label and complete the daily check, or report a problem with a photo, with no account needed.
  • Status everyone can see: A failed check opens a repair, and technicians mark the unit down, so it shows as out of service on every screen.
  • PM by hours or calendar: Schedules per unit or per category, whichever comes first, with the right procedure attached.
  • Battery and charger checks: Reading steps capture voltages and other values; a reading outside its limits fails and opens a repair.
  • Availability by shift: Dashboards and reports list availability, open work and machines at risk; supervisors check them before planning the next bank.
  • Field app for mechanics: Mechanics work their queue on a phone, scan units, log time and parts, and close jobs on the ramp.

Tugs, belt loaders, pushbacks and GPUs

  • Baggage tractors and tugs
  • Belt loaders
  • Pushback tractors
  • Ground power units
  • Air-start and PCA units
  • Deicing trucks
  • Lavatory and water trucks
  • Cargo loaders

Ramp checks and GSE repair time

  • Availability: Tug and belt loader availability before the morning bank tells supervisors whether to borrow units from another gate area.
  • PM compliance: Electric units fall behind on PM when nobody logs their hours; add a meter reading to the shift check.
  • MTTR: A long repair on a pushback tractor can delay departures, so stock its common parts before anything else.
  • Failed checks: If failed checks come mostly from one crew, ask whether the others skip items before blaming the equipment.

Free tools for this

FleetZap Maintenance

Work orders, PM, parts, compliance, assets and KPIs. Explore FleetZap Maintenance.

Frequently asked questions

Can ramp staff report defects without an account?

Yes. Each unit has a QR label. Scanning it with a phone opens the daily check or a problem report with photos. Nothing needs to be installed Dispatchers get a notification the moment a report comes in, with the photo attached.

Can we manage electric GSE?

Yes. Electric tugs and belt loaders are assets like any other, with schedules by hours or calendar. Procedures can include battery and charger readings with limits, and a reading outside them fails the step. Chargers can be tracked as their own assets with their own service history.

How do supervisors see which units are available?

Each unit has a status (available, in service or down) that changes with the work on it. The dashboard shows availability and machines at risk, and the asset list filters by status and location A unit goes back to available when its repair is closed.

Does FleetZap replace airline or airport approvals?

No. FleetZap records maintenance work, checks and history. Your airline, airport and regulatory programs define what must be done and how often. FleetZap schedules that work, captures the results and keeps the records easy to find when an auditor or station manager asks.

Related

Book a demo · Try the live demo