FleetZap · Features · Solutions · FleetZap Maintenance · FleetZap Rentals · FleetZap Dispatch · FleetZap GPS Tracking · What a CMMS does · GPS tracking & engine hours · Dispatch & route optimization · Rentals module · Industries · Customers · Resources · Free calculators · Free templates · Pricing · Contact

Maintenance software for cement and concrete plants

Updated

FleetZap keeps ready-mix trucks, batch plant equipment and loaders on preventive maintenance and shows where your downtime comes from. A mixer that breaks down with a full drum, or a plant conveyor that stops at 6 a.m., can leave a contractor rejecting the load.

Drum build-up and lockout at the batch plant

A ready-mix producer runs a plant and a truck fleet out of the same yard. The batch plant has mixers, conveyors, silos, screw conveyors, dust collectors and compressors that need regular inspection and lubrication. The fleet has mixer trucks, loaders, pumps and service trucks, with service due by miles, engine hours and drum hours. Concrete build-up, abrasion and dust wear parts out faster than in most fleets.

Check drum fins and build-up on a schedule. Hardened concrete on the fins and head adds dead weight and cuts drum capacity, and worn fins slow discharge and leave material behind. Lock out the drum drive before anyone goes inside to chip build-up or measure fin height, and record the readings so you can see how fast each drum wears. Outside the drum, look at the rollers and drum drive for leaks, the chutes for wear, and the water system for leaks. At the plant, dust collector bags, screw conveyor bearings and the mixer liners and blades are the usual wear points.

Chipping a drum, changing mixer liners or clearing a jammed screw conveyor all count as servicing equipment that could start or move, which OSHA’s lockout/tagout standard, 29 CFR 1910.147, covers. It requires written energy control procedures, and an inspection of each procedure at least once a year by an authorized employee other than the ones using it, certified with the machine, the date, the employees included and the inspector. Attach the lockout steps to drum and plant work orders as a procedure, and keep the annual review as a compliance item on each machine with a reminder, so the certification is dated on the asset it covers.

Water systems, frozen lines and boom pumps

  • Water systems get skipped: Tanks, pumps and wash-down hoses aren’t the drum or the engine, so they wait until a driver can’t wash out at the pour.
  • Winter at the plant: Water lines freeze and need draining, and the plant’s water heater has to work before the first batch of the day.
  • Boom pumps: A pump truck’s boom, pipeline and wear parts need inspections of their own, separate from the chassis they ride on.
  • Stopped at the roadside: A mixer gets waved in at a roadside inspection, the driver can’t show a current annual inspection, and the truck sits at the scale while the contractor’s pour waits (hypothetical).

Drum and chute checks plus plant procedures

  • PM by miles, hours or date: Mixer trucks come due on odometer or engine hours plus a date, and plant equipment on the calendar. Each schedule opens its own work order.
  • Daily truck checks by QR: Drivers scan the truck and check drum, chutes, water system and lights; a failed item opens a repair for that truck.
  • Plant inspection procedures: Checklists with pass/fail items, readings with limits and photo steps for conveyors, silos and dust collectors.
  • Compliance reminders: Track truck inspections, registrations and plant permits with reminders and automatic inspection work orders.
  • Downtime cost and failures: See downtime cost per machine and the top problems and causes from repairs.
  • Optional GPS on trucks: Automatic odometer and engine hours, live location and fault codes that open work orders.

Mixer trucks, batch plants, silos and pumps

  • Ready-mix mixer trucks
  • Batch plant mixers
  • Conveyors and screw conveyors
  • Silos and dust collectors
  • Wheel loaders
  • Concrete pumps
  • Air compressors
  • Service trucks

Mixer truck uptime and downtime cost

  • Availability: Mixer availability each morning sets how many pours dispatch can promise; check it before confirming orders.
  • Downtime cost: A batch plant breakdown stops every truck, so give the plant the highest downtime cost in your list.
  • PM compliance: Track PM compliance on boom pumps apart from their chassis, since the boom has inspections of its own.
  • Cost per engine hour: Cost per engine hour on the loaders feeding the plant shows when one is due for a rebuild.

Free tools for this

Sources

FleetZap Maintenance

Work orders, PM, parts, compliance, assets and KPIs. Explore FleetZap Maintenance.

Frequently asked questions

Can FleetZap track both the batch plant and the trucks?

Plant equipment and trucks are all assets, grouped by category and location. Each follows its own schedules and procedures: the dust collector on a calendar inspection, the mixer trucks on miles or engine hours. One list shows everything open across the plant and the fleet, and you can filter it to either.

Can drivers do a daily check on the mixer truck?

Each truck gets a QR label. Drivers scan it and complete the daily check on their phone, covering the drum, chutes, water system, tires and lights. A failed item lands on the shop’s list as a repair on that truck, so the mechanics know about it before the first load is batched.

Can we track drum hours separately?

Each asset has one main meter. Many producers track engine hours or miles on the truck and set up the drum as a sub-asset with its own schedule, such as a fin and build-up inspection on a calendar interval. The drum’s repairs and inspections then sit on its own record under the truck.

Does FleetZap do dispatch for concrete loads?

Concrete orders, load scheduling and delivery tickets stay in your batching and dispatch software. FleetZap tracks whether the trucks and plant equipment those systems depend on are serviced, inspected and ready to run.