FleetZap · Features · Solutions · FleetZap Maintenance · FleetZap Rentals · FleetZap Dispatch · FleetZap GPS Tracking · What a CMMS does · GPS tracking & engine hours · Dispatch & route optimization · Rentals module · Industries · Customers · Resources · Free calculators · Free templates · Pricing · Contact

Maintenance software for railroad contractors

Updated

FleetZap keeps hi-rail trucks and track equipment inspected, serviced and documented, with schedules by miles and engine hours and inspection records ready whenever a railway asks.

Track windows at night and hi-rail checks

Railroad contractors run a mix of road and rail equipment: hi-rail pickups and boom trucks, excavators and loaders with rail gear, tampers, ballast regulators, tie handlers, rail saws, welders and generators. Hi-rail vehicles log both road miles and engine hours, and the rail gear needs its own inspection. Railways and owners expect equipment to be inspected and documented before it goes on track.

Track time is booked in advance, often at night, and a machine that fails on the rail can lose the window and hold up other crews. Equipment moves between projects over long distances, and inspection records, certificates and service history have to be ready whenever a railway or customer asks.

FRA’s roadway worker rule, 49 CFR 214.523, sets the hi-rail inspection rhythm. Before using the vehicle at the start of a shift, the operator checks it, and any defect that can’t be fixed right away is tagged, dated and reported to the designated official. The hi-rail gear gets a safety inspection at least annually, with no more than 14 months between inspections, and tram, wheel wear and gage are measured and adjusted as needed. The employer keeps the annual record, on paper or electronically, until the next inspection. A FleetZap procedure with readings for tram and gage, plus a compliance item for the annual date, covers both.

Short track windows and hi-rail wear

  • Fixed track windows: A machine that fails on the rail can cost the crew its whole work window.
  • Road and rail wear: Hi-rail units need service by road miles and engine hours, plus guide wheel wear and gage checks.
  • Documentation on demand: Railways and customers may ask for inspection records and certificates at any time.
  • Spread-out projects: Machines work far from the shop, often for weeks at a time.

Hi-rail inspections and rail gear sub-assets

  • Inspection procedures: Build hi-rail and machine inspections with pass/fail items, readings and a signature; required steps must be done before the job closes.
  • PM by miles, hours or date: Schedules follow miles, engine hours or calendar, whichever comes first, per unit or category.
  • Certification reminders: Compliance items for inspections, registrations, permits and certifications, with reminders and optional inspection work orders.
  • Rail gear as sub-assets: Record rail gear, attachments and welders as sub-assets with their own history and schedules.
  • Records ready to send: Each machine’s history of inspections, repairs and parts can be printed or exported to CSV.
  • Field app for mechanics: Mechanics work jobs, steps, photos and timers on a phone at remote sites; photos and step answers made without signal sync later.

Hi-rail trucks, tampers, regulators and tie handlers

  • Hi-rail pickups
  • Hi-rail boom and crane trucks
  • Rail-gear excavators
  • Tampers
  • Ballast regulators
  • Tie handlers
  • Rail saws and drills
  • Welders and generators

Hi-rail checks and repair time on the rail

  • Availability: Confirm tamper and regulator availability the day before a track window, so the crew doesn’t lose it.
  • PM compliance: PM compliance on hi-rail units has to cover road miles and engine hours, so check both schedules.
  • Failed checks: A failed guide wheel or gage check should keep the unit off the rail until the repair closes.
  • MTTR: MTTR at remote sites includes waiting for parts; send likely spares with the machine on long projects.

Free tools for this

Sources

FleetZap Maintenance

Work orders, PM, parts, compliance, assets and KPIs. Explore FleetZap Maintenance.

Frequently asked questions

Can we schedule hi-rail maintenance by both miles and hours?

Yes. A schedule can follow miles, engine hours or a calendar interval, whichever comes first. You can set separate schedules for the truck and for its rail gear if the gear is recorded as a sub-asset. Hours can come from the operator’s daily check or optional telematics.

Can FleetZap store inspection records for the railway?

Yes. Inspections are completed as work orders with checklists, readings, photos and a signature step, and the results stay on the machine’s history. You can print them or export to CSV. The railway or owner decides what inspection records they require.

Can operators check machines before going on track?

Yes. Before going on track the operator scans the QR label and runs the pre-use check on a phone without an account. A failed item, such as a guide wheel or brake problem, opens a repair work order and alerts dispatchers before the truck goes on the rail.

Can we track certificates for equipment and people?

Yes. Compliance items can belong to a machine, a person or the company, with an expiry date, reminder window and renewal interval, so certificates and permits don’t lapse unnoticed. Operator qualifications can sit on the person, and the hi-rail gear’s annual inspection on the truck, each with its own reminder before it lapses.

Related

Book a demo · Try the live demo