Maintenance software for road construction contractors
Updated
For road builders, FleetZap keeps graders, dozers, milling machines, rollers, trucks and work-zone equipment on preventive maintenance, with QR pre-start checks on night shifts and every repair logged against its machine.
Night closures, work-zone gear and subgrade machines
Road construction fleets build the road before anyone paves it. Motor graders and dozers cut and trim subgrade, excavators and loaders work the ditches, rollers compact base, and cold planers take off the old surface. Around them sits the work-zone fleet of arrow boards, message boards, light towers and truck-mounted attenuators, plus dump trucks, water trucks and distributors. Heavy equipment runs on engine hours; boards and trailers usually go on a calendar interval.
A hypothetical night shift on a state highway job: the lane closure opens at 9 p.m., and at 8:30 the operator scans the QR label on light tower LT-07 and runs its pre-start check. The hour meter goes in as 2,140, one lamp fails the lights item, and FleetZap opens a repair work order on that tower and notifies the dispatcher. The night mechanic swaps the lamp before the closure opens and logs the part and labor, and the tower’s history now shows the reading, the repair and who did it.
On a jobsite closed to public traffic, OSHA’s construction rule for motor vehicles, 29 CFR 1926.601(b)(14), calls for a check at the start of each shift of service and parking brakes, tires, horn, steering, coupling devices, seat belts, operating controls and safety devices, plus lights and wipers where the vehicle needs them, and defects have to be corrected before the vehicle goes back into service. Dump trucks and water trucks inside the closure fall under it, which makes their pre-start checklist a regulatory record. Who owns the fleet changes the rest: a state DOT maintains its own graders and plow trucks year-round from fixed garages, while a contractor’s machines move from contract to contract, and each one’s records have to follow it to the next job.
Night defects, roaming arrow boards and worn edges
- Night defects, day shop: Lane closures run at night while the shop works days, and a defect found at 2 a.m. reaches the mechanic by word of mouth.
- Work-zone gear nobody owns: Arrow boards and light towers sit on trailers at the closure, get moved by whoever is nearest, and miss their oil changes.
- Cutting edges and undercarriage: Grader blades, end bits and dozer undercarriage wear on every subgrade pass, and the measurements rarely leave the operator’s notebook.
- Records between contracts: A contractor’s grader may work several DOT contracts in a season, and its service history ends up split across the project files.
Pre-start checks and machines tracked by project
- PM by engine hours: Schedules by hours and calendar, whichever comes first, projected from each machine’s daily use.
- Pre-start checks by QR: Operators scan the label and do the pre-start check on a phone at any hour; a failed item opens a repair before the lane closure opens.
- Machines by project: Record projects as job-site locations and see which machines are where.
- Winter work on the calendar: Deferred repairs and rebuilds go into the backlog and onto the calendar and workload board for the off-season.
- Failure codes: Problem, cause and remedy codes show which machines and components fail most, season after season.
- Mechanics in the field: The field app lets mechanics take jobs, follow steps, add photos and log time on site; photos and step answers made without signal sync later.
Cold planers, graders, distributors and message boards
- Asphalt pavers
- Cold planers / milling machines
- Rollers and compactors
- Motor graders
- Dump trucks
- Water trucks
- Asphalt distributors
- Light towers and message boards
Road fleet backlog and time between failures
- Availability: Count working light towers and arrow boards before a night closure opens; a dark tower holds up the setup.
- PM compliance: Night crews skip PM when the shop works days; schedule services on weekend breaks between lane closures.
- MTBF: A grader whose failures come closer together through the season belongs on the winter rebuild list.
- Backlog: Open repairs piling up in August are deferred work; decide which ones can wait for the winter shop.
Free tools for this
- Asphalt calculator (tons): Tons of hot mix asphalt for a paving job, and the truckloads
- Experience modification rate (EMR) calculator: Your workers’ comp experience mod from the NCCI formula, and its effect on premium
- Sand and crushed stone calculator: Cubic yards, tons, truckloads and bags of sand or crushed stone
- Equipment cost per hour calculator: Owning plus operating cost, divided by the hours a machine works
Sources
FleetZap Maintenance
Work orders, PM, parts, compliance, assets and KPIs. Explore FleetZap Maintenance.
Frequently asked questions
Can FleetZap schedule grader and dozer service by hours?
Yes. Each machine has its own meter, and schedules can follow hours, calendar intervals or both, whichever comes first. Readings come from operators’ daily checks, the shop, fuel logs or optional telematics, and FleetZap projects the next service from each machine’s recent daily use.
How do we plan winter rebuilds?
Keep deferred repairs as open work orders through the season. In the off-season, use the calendar and workload board to schedule them against each mechanic’s capacity, and use failure and cost history to decide what to rebuild. Cutting edges, mill teeth and undercarriage parts can be ordered ahead from stock levels.
Can operators do checks on night shifts?
Yes. The QR check works on any phone at any hour with no account. A failed item opens a repair work order and notifies your dispatchers. The day shift arrives to find last night’s light tower fault already on the list.
Can we see which machines break down most?
Yes. When repairs are closed with problem, cause and remedy codes, the failure report shows the top problems and repeat offenders, and MTBF shows how long each machine runs between failures. Compare one season with the last before you decide what to rebuild over the winter.