FleetZap · Features · Solutions · FleetZap Maintenance · FleetZap Rentals · FleetZap Dispatch · FleetZap GPS Tracking · What a CMMS does · GPS tracking & engine hours · Dispatch & route optimization · Rentals module · Industries · Customers · Resources · Free calculators · Free templates · Pricing · Contact

Maintenance software for well drilling contractors

Updated

FleetZap keeps drill rigs, compressors, mud pumps and support trucks on preventive maintenance, gives each rig component its own hour meter, and puts the service history on a phone that saves step answers and photos even without signal.

Rigs on rural sites, hours from parts

Well drilling contractors run a small but costly fleet: truck- or track-mounted drill rigs, air compressors, mud pumps, water trucks, pipe trucks and trailers, along with generators, welders and development and pump-installation equipment. Rigs often carry their own engines, compressors and hydraulics, each with its own hours and service needs, and drill tooling wears with every hole.

Rigs spend days on rural sites, often with poor cell coverage. Say the compressor on a hypothetical air rotary rig fails hours from the nearest parts house: the crew loses the day, and someone loses another driving for parts. With the compressor recorded as a sub-asset with its own hour meter, its oil, separator and filter services come due on compressor hours, separate from the carrier’s odometer, and its history shows how long it ran since its last repair. Each rig’s cost per hour then tells you what to charge for a hole and when a rebuild beats another season of repairs.

Two wear points deserve their own lines on the daily rig check. In mud rotary drilling, sand in the fluid wears the pump’s liners, pistons and valves, so drillers watch discharge pressure and listen for a knocking valve between holes. In air rotary drilling, the down-the-hole hammer depends on rock drill oil fed into the air line, and a dry hammer wears its piston and bit fast; dusty sites also load the compressor’s intake filters. Logging those checks gives you a record of when each part was last looked at.

Rural sites and rigs with several engines

  • Remote sites: Rigs work far from the shop, often with weak signal, and parts are hours away.
  • Several components per rig: Carrier, deck engine, compressor and hydraulics each need their own service.
  • Tooling wear: Bits, hammers and rods wear quickly and are expensive to replace.
  • High-value machines: A few rigs carry the business, and a rig down on site means a crew paid to wait.

Separate hour meters for each rig component

  • PM by hours per component: Record the deck engine, compressor and mud pump as sub-assets of the rig, each with its own hour meter and schedule.
  • Daily rig checks by QR: The driller scans the label and completes the check on a phone with no account; a failed item opens a repair on the rig.
  • Saves work without signal: Mechanics’ step answers, comments, photos and status changes are saved on site without signal and sync when they’re back in coverage.
  • Tooling and parts: Track bits, hammers, filters and wear parts with reorder points, vendors and purchase orders.
  • Cost per rig hour: Parts, labor, outside repairs and fuel roll up into each rig’s cost of ownership and cost per engine hour.
  • Registrations and permits: Track truck registrations, inspections and permits with reminders.

Drill rigs, compressors, mud pumps and pump hoists

  • Truck-mounted drill rigs
  • Track-mounted drill rigs
  • Air compressors
  • Mud pumps
  • Water trucks
  • Pipe trucks and trailers
  • Pump hoists
  • Generators and welders

Rig downtime and cost per engine hour

  • Cost per engine hour: Cost per engine hour on the deck engine and the carrier, side by side, shows which component drives the rig’s cost.
  • Availability: When a rig’s availability drops, the crew is paid to wait; find out whether parts or mechanic travel is the cause.
  • PM compliance: PM compliance on the compressor often lags the carrier, so make its hour reading a required daily check step.
  • Downtime cost: Downtime cost per rig hour helps you decide how many spare filters and hoses ride on the support truck.

Free tools for this

FleetZap Maintenance

Work orders, PM, parts, compliance, assets and KPIs. Explore FleetZap Maintenance.

Frequently asked questions

Can we track the rig’s engine, compressor and pump separately?

Yes. Record them as sub-assets of the rig. Each has its own hour meter, preventive maintenance schedule and history, while the rig’s record rolls up the cost of all its components, so you can see whether the deck engine or the compressor costs you more.

Does FleetZap work where there’s no cell signal?

Partly. Step answers, comments, photos and status changes made with no signal stay on the phone and sync automatically when it’s back in coverage. A driller can work through a rig check on site with no bars on the phone, and the shop sees it that evening once the truck reaches coverage.

Can we track drill tooling?

Yes. Bits, hammers, rods and wear parts can be parts in inventory with stock levels, reorder points and vendors. When they’re used on a work order the cost goes onto that rig’s history. Comparing that cost across rigs shows which formation or crew wears tooling fastest.

Is it suitable for a small drilling company?

Yes. You can start with a few rigs and a couple of users. Everything works manually in a browser and on phones, with no GPS or integrations required, and step answers and photos recorded on sites without signal sync later. Add rigs as the business grows.

Related

Book a demo · Try the live demo