FleetZap · Features · Solutions · FleetZap Maintenance · FleetZap Rentals · FleetZap Dispatch · FleetZap GPS Tracking · What a CMMS does · GPS tracking & engine hours · Dispatch & route optimization · Rentals module · Industries · Customers · Resources · Free calculators · Free templates · Pricing · Contact

Equipment maintenance plan template

Updated · Reviewed by Israel Margulies, founder and CEO of High Point GPS

A maintenance plan template that sets out, machine by machine, how each one will be looked after: the strategy, the tasks, who’s responsible, which spare parts to keep and how you’ll know the plan is working.

A plan sits above the schedule. It decides that the main loader gets strict meter-based PM and critical spares on the shelf, that the old pressure washer is run to failure, and that the plan is reviewed every year. The schedule then puts those decisions into dates and meter readings.

Fill in the asset table first, ranking each machine by criticality, meaning what happens to the business if it’s down. The sections below capture the rest: strategy, responsibilities, parts, budget and the measures you’ll review.

Maintenance plan

Fields: Organization / site · Plan owner · Period covered · Version / date · Approved by

Log columns: Machine / tag · Criticality (high / med / low) · Strategy (PM / condition / run to failure) · Key PM tasks & intervals · Critical spares · Responsible · Outside vendor · Notes

Goals for the period

  • Availability target for critical machines
  • PM compliance target
  • Planned vs reactive work target
  • Budget limit

Roles & responsibilities

  • Who approves work requests
  • Who schedules PM and assigns work
  • Who does daily operator checks
  • Who orders parts
  • Which work goes to outside vendors

Spare parts & resources

  • Critical spares to hold and minimum quantities
  • Consumables kitted per service (filters, fluids)
  • Lead times for long-wait parts
  • Special tools and diagnostic equipment

Records & review

  • Where work orders and checklists are kept
  • Meter readings: how and how often
  • KPIs reviewed monthly
  • Date of next plan review

Fill it in the right way

  1. List every machine and rank its criticality by the effect of it being down: safety, production, customers and cost.
  2. Choose a strategy per machine: time or meter-based PM, condition-based checks, or run to failure for cheap, non-critical items.
  3. Write the key PM tasks and intervals from the manufacturer’s manual; details go in the schedule and checklists.
  4. Decide which spares to hold for critical machines, based on lead times and the cost of downtime.
  5. Assign responsibilities and set a few measurable goals.
  6. Review the plan at least once a year and after any major failure.

Tips

  • Spend effort where downtime hurts most. A spare compressor doesn’t need the same plan as your only loader.
  • Run to failure is a legitimate choice when a failure is cheap, safe and quick to fix. Write it down so it’s a decision, not neglect.
  • Keep KPIs to a handful you’ll actually look at: availability, PM compliance, backlog and downtime cost are a good start.
  • Use the failures from last year to adjust tasks for this year.

Do it in FleetZap

  • Each machine carries criticality, warranty dates, a spare-parts list and its full lifecycle history.
  • Preventive schedules by meter and/or calendar open work orders automatically with the procedure attached.
  • Reports cover availability, PM compliance, planned vs reactive work, backlog, MTBF, MTTR and downtime cost.
  • Health scores (0 to 100, with reasons) highlight machines that need attention before they fail.
  • Parts track stock, reorder points, vendors and purchase orders.

Free tools for this

FleetZap Maintenance

Work orders, PM, parts, compliance, assets and KPIs. Explore FleetZap Maintenance.

Frequently asked questions

What should a maintenance plan include?

An asset list with criticality, the maintenance strategy and key tasks for each machine, responsibilities, spare parts, a budget, the records you’ll keep and the KPIs you’ll review.

How is a maintenance plan different from a PM schedule?

The plan sets the approach and priorities; the schedule lists the exact services and when they’re due. The plan changes yearly, the schedule changes weekly.

How do I rank criticality?

Ask what happens if the machine stops: is anyone at risk, does work stop, is there a backup, and how long and costly is a repair? Machines scoring high on these get the strictest care.

How often should the plan be reviewed?

At least once a year, and whenever you add machines, change how they’re used, or have a major failure the plan didn’t anticipate.