Automatic transfer switch maintenance comes down to a monthly transfer test, a quick monthly look inside the enclosure, and a yearly de-energized service: torque the connections, inspect and measure the contacts, lubricate the mechanism and scan for heat. NFPA 110 requires transfer switches in emergency power systems to be operated every month. The rest of the schedule comes from the switch manufacturer and from guidance such as the Pacific Northwest National Laboratory’s ATS checklist.
What wears out in a transfer switch
An automatic transfer switch (ATS) sits idle for weeks, then has to move the building’s emergency loads from utility power to the generator in one motion. Its weak points are the parts that carry current or move. Main and arcing contacts pit and erode every time they break current. Cable lugs and bus joints loosen and run hot. The mechanism’s lubricant dries out, and the controller holds voltage, frequency and timer settings that someone can change by mistake.
Location adds wear. ASCO’s maintenance white paper (ASCO is now part of Schneider Electric) points to moisture and airborne chemicals, giving a switch at a water or wastewater plant as an example, and tells owners to inspect more often in conditions like that.
Automatic transfer switch maintenance schedule
Use the manufacturer’s schedule as the base. PNNL’s operations and maintenance checklist for ATS equipment splits the work by frequency, and NFPA 110 adds the monthly operation and the 36-month system test.
- Monthly: electrically operate the switch from the normal source to the alternate source and back (NFPA 110, 8.4.6)
- Monthly: inspect the enclosure inside and out for heat stress or signs of moisture
- Monthly: look over wiring, insulation and connectors for cracks, deformation or heat discoloration
- Semi-annually: check control wiring and connections to the control panel; tighten or replace
- Semi-annually: clean and vacuum the enclosure; check and replace controller batteries if fitted
- Annually: check torque on all lugs and bus connections
- Annually: lubricate mechanical parts as the manufacturer specifies
- Annually: infrared scan of connections and contacts
- Annually: transfer test with the generator carrying full building load for one hour
- Every 36 months for Level 1 systems: a system test started from the transfer switch test functions (NFPA 110, 8.4.9)
Running the monthly transfer test
NFPA 110 defines the monthly test as electrically operating the switch from the primary position to the alternate position and then back. Do it with the generator’s monthly exercise so both are proven on the same run, and tell the building first, because loads may blink on an open-transition switch.
Write down more than a tick. Record the date, who ran it, how it was started (test switch, controller or opening the normal breaker), how long the generator took to start and take load, the retransfer and cool-down timer behavior, and any alarm on the controller. If those times drift from last month’s, you can chase the cause during a planned test instead of during a utility outage.
Annual ATS maintenance checklist
The yearly service is where a technician opens the switch. ASCO’s list starts with a visual check of accessible parts for heat, water and mechanical damage, then moves inside only after the upstream gear is de-energized or the switch is placed in bypass. Bring the manufacturer’s latest service bulletins and software updates to the job.
- Inspect the transfer mechanism, control wiring, relays and their contacts
- Inspect insulating parts, mechanism covers and arc chutes for heat, discoloration or damage; replace worn ones
- Check alignment, deflection, gap and wiping action of the main and arcing contacts
- Inspect contacts for wear, pitting, erosion and discoloration
- Check tightness of all de-energized cable, wire and bus connections
- Record voltage and frequency sensing, pickup, dropout and timer settings
- Measure voltage and current on each phase before the inspection
- Measure the millivolt drop across each main contact in each source position, and contact resistance across main and arcing contacts
- Replace eroded arcing contacts; adjust contacts per the manufacturer’s procedure
- Remove old lubricant residue and relubricate the mechanism and linkages
- Operate the switch manually, clean the enclosure, then run a transfer test under load if the facility approves
Measurements tell you more than a visual check
ASCO’s paper warns that a low-cost service limited to looking and cleaning can’t establish whether the switch will work, because the condition shows up in electrical measurements. Millivolt drop and contact resistance change as contacts erode or connections loosen. ASCO tells technicians to compare each value with the manufacturer’s specification and with the readings from earlier inspections, and to investigate significant year-to-year changes.
Keep each year’s measurements per phase and per contact in the switch’s record, next to the controller settings. If the settings change by accident, the recorded values let you put them back. Millivolt drop depends on the current flowing through the contact, so write the load current next to each reading, or a heavier load on test day will look like wear.
What drift looks like: a sample millivolt-drop log
The log below is hypothetical. The numbers show the pattern to look for and are not limits: your switch’s acceptable values come from its manufacturer. Each line is the millivolt drop across one pole’s main contact in the normal position, taken at the same approximate load current at each annual visit.
Poles A and B move by a millivolt or two between visits. Pole C has more than doubled in two years while the other poles held steady, so the technician should inspect that contact and its connections for erosion, pitting or a loose joint, and compare the reading with the manufacturer’s figure, before the next monthly test.
- Pole A: 18 mV in year 1, 19 mV in year 2, 18 mV in year 3
- Pole B: 17 mV in year 1, 18 mV in year 2, 19 mV in year 3
- Pole C: 18 mV in year 1, 24 mV in year 2, 37 mV in year 3
Safety before anyone opens the enclosure
OSHA’s electrical work practice rule, 29 CFR 1910.333, requires live parts to be de-energized before an employee works on or near them, unless the employer can show that de-energizing creates greater hazards or isn’t feasible. Parts that were switched off but not locked out or tagged count as energized under that rule. An ATS has two sources, so both must be isolated, along with the generator start circuit.
Some tasks, such as the infrared scan and load readings, need the switch energized. Those call for an arc flash assessment and the PPE that goes with it; PNNL and ASCO both point to NFPA 70E and IEEE 1584 for that work. Sites that can’t drop the load for a yearly outage often install bypass-isolation transfer switches, which let a technician isolate the ATS while the bypass carries the load.
Who should service the switch
PNNL limits ATS work to qualified, experienced personnel. ASCO adds questions worth asking any provider: whether the manufacturer authorizes them on your switch, how their technicians are trained, how they hear about product changes and where they get spares.
Your own staff can own the monthly test and the monthly enclosure check. The annual de-energized service and the contact measurements belong with an electrician or service technician trained on that make.
Keeping ATS maintenance on schedule in FleetZap
Add each transfer switch to FleetZap as its own asset with location, criticality and its documents, or as a sub-asset under its generator if you turn sub-assets on. Calendar-based preventive maintenance schedules open the monthly test, the semi-annual check and the annual service as work orders on their own, each with its procedure attached.
Procedure steps can be pass/fail checks, readings with minimum and maximum limits (millivolt drop or transfer time), photos of infrared images and a technician’s signature. Required steps must be answered before the job can close, and a failed check opens one linked repair work order. When an outside electrician does the annual service, you record the vendor, their reference number and their charge on the job, so the switch’s history shows every visit, reading and dollar in one place.
Key takeaways
- A pole whose millivolt drop climbs every year while the others hold steady goes on the work list for the next visit, even if it still sits inside the manufacturer’s limit.
- Ask your service provider for a report that lists each measured value per pole and source position, plus the controller’s downloaded event log and settings; a pass/fail sheet gives you nothing to trend.
- Write the isolation steps for each switch into its procedure (utility feed, generator output and generator start circuit) so a new technician doesn’t have to work them out on the day.
- If the facility can never take an outage for the annual service, price a bypass-isolation switch before the next replacement or major repair.
Free tools for this
- Next PM due calculator: When the next service comes due, in hours and on the calendar
- MTBF calculator: Mean time between failures, mean time to repair and availability
- OEE calculator: Overall equipment effectiveness from availability, performance and quality
- Uptime calculator: Downtime allowed per year, month, week and day at an uptime target, and your actual uptime
Sources
- PNNL: Best practices for automatic transfer switch operation and maintenance
- Cummins: NFPA 110 testing and service requirements for standby power systems
- Schneider Electric (ASCO): Maintaining automatic transfer switches for reliability and longevity
- eCFR 29 CFR 1910.333: Selection and use of work practices
FleetZap Maintenance
Work orders, PM, parts, compliance, assets and KPIs. Explore FleetZap Maintenance.
Frequently asked questions
How often should an automatic transfer switch be tested?
NFPA 110 requires transfer switches in emergency power supply systems to be operated monthly, moving the load from the normal source to the alternate source and back. PNNL’s guidance adds a yearly transfer test with the generator carrying full building load for an hour. Level 1 systems also get a full system test at least every 36 months, started from the transfer switches.
What does automatic transfer switch maintenance include?
Monthly, operate the switch and inspect the enclosure and wiring for heat or moisture. Twice a year, tighten control connections, clean the enclosure and check controller batteries. Each year, torque lugs and bus joints, inspect and measure the main and arcing contacts, relubricate the mechanism, record controller settings and do an infrared scan. Follow the manufacturer’s manual for the exact tasks.
Can ATS maintenance be done without shutting off power?
Part of it can. Visual checks, infrared scans and load readings happen with the switch energized, under arc flash precautions. Opening the switch to inspect contacts and torque connections requires de-energizing it, unless it is a bypass-isolation design where the bypass carries the load while the ATS is isolated. OSHA requires de-energizing live parts before work unless that is infeasible or more hazardous.
Does NFPA 110 require annual transfer switch maintenance?
NFPA 110 requires monthly operation of transfer switches, and ASCO points to sections 8.3.4 and 8.3.5 of NFPA 110 as requiring annual ATS inspection and maintenance with electrical measurements at regulated facilities such as hospitals. Your authority having jurisdiction decides which edition and requirements apply to your building, so confirm with them and keep dated records.
Who is qualified to maintain an automatic transfer switch?
PNNL limits ATS work to qualified and experienced personnel because both sources carry dangerous voltage. In practice that means an electrician or service technician trained on the switch make, working to NFPA 70E. Facility staff can run the monthly transfer test and visual checks. Ask any contractor whether the manufacturer authorizes them and how they get parts.