FleetZap · Features · Solutions · FleetZap Maintenance · FleetZap Rentals · FleetZap Dispatch · FleetZap GPS Tracking · What a CMMS does · GPS tracking & engine hours · Dispatch & route optimization · Rentals module · Industries · Customers · Resources · Free calculators · Free templates · Pricing · Contact

Parts kitting for maintenance: how to set it up

Updated · Reviewed by Israel Margulies, founder and CEO of High Point GPS

To set up parts kitting, build a parts list for each machine model and service, pull and label the kits a week or two before the scheduled jobs, and keep stock records accurate so the parts are on the shelf when you pull them. Kitting means gathering every part a job needs (filters, gaskets, belts, fluids) into one kit before the technician starts, and it suits preventive maintenance best because those parts are predictable.

Free tool: Safety stock calculator: How many spare parts to keep on the shelf against slow deliveries.

Why kitting helps

Technicians lose time hunting for parts, waiting at the counter or finding halfway through a job that a filter is out of stock, with the machine sitting open in the bay. Kitting moves that work to the days before the job, and a shortage shows up while there’s still time to order.

Build a kit list for each machine and service

List the parts for each common service on each machine model, from the manual and from what your technicians have learned. Record part numbers, quantities and approved alternates. Fleets with many units of one model gain the most, since one kit list covers all of them.

A hypothetical 500-hour service kit for a mid-size excavator might read: engine oil filter, primary and secondary fuel filters, engine oil in the quantity the manual gives, a new drain plug washer, the pilot hydraulic filter if the manual lists it at that interval, and an oil sample bottle. Check each line against your own model’s manual. A typical kit list covers:

  • Filters: oil, fuel, air, hydraulic, cab
  • Fluids and lubricants by quantity
  • Gaskets, O-rings and drain plug washers
  • Belts, wiper blades and other wear items due at that interval
  • Consumables such as sample bottles or cable ties

Stage kits before the job

Look at the scheduled maintenance for the next week or two and pull those kits. Label each bag or tote with the machine and work order number and keep it in a staging area. Check each kit against its list as you build it, so a missing gasket gets ordered this week instead of discovered in the bay.

Keep stock accurate

Record parts as they’re used, set reorder points for every kit part and count those bins more often than the rest. When a technician brings parts back unused, return them to stock in the system as well as on the shelf.

Kitting with FleetZap

In FleetZap, each machine keeps a spare-parts list (part, quantity per job and a note) shown with live stock in the machine’s record, and the work order’s part picker lists that machine’s spares first. Use it as the kit list for the machine’s common services.

Preventive maintenance schedules open work orders automatically with the procedure attached, and the calendar shows upcoming services so you know which kits to pull. Parts used are deducted from stock, reorder points drive reorder suggestions grouped by vendor, and purchase orders are received back into stock at weighted average cost.

Key takeaways

  • Start with your most common model’s most frequent service; one good kit list covers every unit of that model.
  • Label each bag or tote with the work order number so the technician grabs the right one without checking part numbers.
  • Watch which parts come back unused and drop them from the list, or kits slowly grow and tie up stock.

Free tools for this

Sources

FleetZap Maintenance

Work orders, PM, parts, compliance, assets and KPIs. Explore FleetZap Maintenance.

Frequently asked questions

Which jobs should be kitted?

Preventive maintenance and other planned jobs with predictable parts are the best candidates. Unplanned repairs are harder to kit, but your most frequent ones, such as a cutting edge change or a common hose replacement, can have a standard list too. Start with the service you do most often on your largest group of identical machines.

Who should build the kits?

A parts or stores person if you have one. In a small shop, a technician can build next week’s kits during a quiet afternoon. Either way, the kit should be complete and labeled before the work order is assigned, so the technician picks it up on the way to the machine and starts work straight away.

What if a job doesn’t use every part in the kit?

Return unused parts to stock and record the return, so inventory stays accurate. If the same part comes back from most jobs, take it off the kit list or mark it optional. Parts that technicians keep fetching on top of the kit point the other way: add them to the list.

Can kits be bought pre-assembled?

Some manufacturers and dealers sell service kits for common intervals, packed by model. They save picking time, but compare the contents with your own list, since a dealer kit may leave out items such as drain plug washers or include filters you already stock. Check lead times before you rely on them.

Related

Book a demo · Try the live demo