FleetZap · Features · Solutions · FleetZap Maintenance · FleetZap Rentals · FleetZap Dispatch · FleetZap GPS Tracking · What a CMMS does · GPS tracking & engine hours · Dispatch & route optimization · Rentals module · Industries · Customers · Resources · Free calculators · Free templates · Pricing · Contact

Maintenance software for apartments and multifamily properties

Updated

FleetZap turns apartment residents’ requests into work orders and schedules PM for boilers, elevators, roofs and unit turns. Technicians get every job in a phone app that saves step answers and photos even in basements without signal.

Unit turns and building systems together

A multifamily team looks after the building systems (boilers, chillers, rooftop units, pumps, elevators, fire equipment, laundry and parking garages) and every unit’s appliances, fixtures and finishes. Resident requests come in by phone, by email and through the leasing office, sometimes all at once for the same leak.

Spread that across several buildings and open requests get lost or done twice, while boilers and rooftop units wait until a resident calls about no heat. Turn work tracked on paper holds up the next move-in. Elevator, fire system and roofing contractors keep their own records, so their visits and costs never reach the building file. When a boiler fails on a weekend, the tech on call has no history to go on and can’t tell whether the part is in the storeroom.

A unit turn runs much the same list every time: patch and paint, clean or replace flooring, test every appliance, check under the sinks for leaks, test the smoke and carbon monoxide alarms, change the HVAC filter and rekey the locks. Built as a FleetZap procedure, each item is a pass/fail or photo step, so the manager can see the finished unit in photos before handing over keys. A failed step, such as an oven element that won’t heat, opens its own repair work order and the tech moves on to the next room.

Older buildings add a federal rule to the turn list. EPA’s Lead Renovation, Repair and Painting Rule covers paid work that disturbs paint in housing built before 1978, apartments included, and it names residential rental property managers among the firms that need certification. Small jobs are exempt: up to 6 square feet of paint per room inside, or 20 square feet outside. Window replacement is covered whatever its size. For those buildings, give the turn procedure its own pass/fail step asking whether the job disturbs more paint than that. A yes sends the work to your certified renovator before anyone sands a sill.

Missed warranties, repeat leaks and untested alarms

  • Warranties nobody checks: A two-year-old dishwasher gets a paid service call because nobody looked up that it was still covered.
  • The same unit, again: A slow drain or a running toilet gets fixed three times in a year, and nobody sees the pattern until the ceiling below is wet.
  • Alarms in occupied units: Smoke and CO alarms get tested at each turn, but a unit with a long-term resident can go years without a check.
  • No cost per building: Owners ask what a building costs to keep up, and the answer is split between invoices, the parts closet and timesheets.

Resident requests, unit turns and building PM

  • Requests by link or QR: Residents or staff send a request with photos from a link or a QR label in the laundry room or lobby; you approve it into a work order.
  • Work orders with photos: Every job has a priority, an assignee, a checklist, photos with markup, comments and time.
  • Building PM by date: Schedule boiler, rooftop unit, pump and fire equipment checks by calendar across every building.
  • Buildings, floors and units: Nest locations from property to building, floor and unit, with equipment and appliances as assets in each.
  • Unit turn procedures: A turn checklist with pass/fail and photo steps for paint, appliances and alarms; each failed item opens its own repair.
  • Vendors and parts: Record outside contractor work with its cost, keep parts on hand with reorder points, and raise purchase orders.

Boilers, rooftop units, elevators and appliances

  • Boilers
  • Rooftop HVAC units
  • Chillers
  • Domestic water pumps
  • Elevators
  • Fire alarm and sprinkler equipment
  • Laundry machines
  • Unit appliances

Time to complete and cost per building

  • Open requests: If open requests climb at one building, check whether a single vendor job or a short-staffed week is holding them up.
  • Time to complete: Long completion times on turn work delay move-ins; split turn checklists into separate repairs so each one gets an assignee.
  • PM compliance: Missed boiler or rooftop unit PM before heating or cooling season turns into emergency calls; review it monthly.
  • Cost per building: When one building runs well above the rest, read its oldest systems’ repair history before the owners’ next budget.

Free tools for this

Sources

FleetZap Maintenance

Work orders, PM, parts, compliance, assets and KPIs. Explore FleetZap Maintenance.

Frequently asked questions

Can residents submit requests without an account?

Residents scan a QR label or open the request link, describe the problem and attach photos, with no sign-in or app. Your team sees each request first and approves it into a work order, so duplicates and non-maintenance questions get screened out before they reach a technician.

Does FleetZap handle leases or rent collection?

FleetZap stops at maintenance for your buildings, systems and appliances. Leases, rent collection and tenant accounts stay in your property management software. You keep both: residents’ requests come into FleetZap, and the leasing side carries on in the system it already uses.

Can we organize by building and unit?

Locations nest, so you can set up property → building → floor → unit and file each appliance under its unit. Assets, work orders and requests all filter by location, which lets a supervisor pull up everything open in one building before walking it.

Can technicians work from their phones?

The field app shows each technician their jobs and lets them add photos, complete checklists and track time. Step answers, comments, photos and status changes made without signal in basements and mechanical rooms sync when the phone reconnects, so a job closed in the boiler room still reaches the office.

Related

Book a demo · Try the live demo