FleetZap · Features · Solutions · FleetZap Maintenance · FleetZap Rentals · FleetZap Dispatch · FleetZap GPS Tracking · What a CMMS does · GPS tracking & engine hours · Dispatch & route optimization · Rentals module · Industries · Customers · Resources · Free calculators · Free templates · Pricing · Contact

Maintenance software for condos and HOAs

Updated

Condo corporations and HOAs use FleetZap to take owner requests, schedule common-area maintenance and keep contractor work and costs on one record the board can review.

Pools, garages and contractor reports for the board

Condo corporations, homeowners’ associations and their property managers look after the shared parts of a building. The big-ticket items are the roof, the boilers and chillers, the elevators and the parking garage; around them sit the lobby, pool, gym, generator, fire systems and grounds. Contractors do much of the work, and the board wants to know what each visit fixed and what it cost.

Owner requests arrive by email and phone. Reserve planning depends on the age and condition of each system, but that information is spread across invoices and old reports, and it goes missing when a manager or a board changes. A missed inspection or an unplanned roof or boiler replacement ends up as a special assessment on the owners.

Pools come with a federal rule. The Virginia Graeme Baker Pool and Spa Safety Act counts a pool open only to the residents of an apartment building or other multi-family residential area as a public pool. That means anti-entrapment drain covers meeting ASME/ANSI A112.19.8 or its successor, and a pool with a single main drain that can be blocked also needs a backup such as a safety vacuum release system or an automatic pump shut-off. Put the drain covers on the spring opening checklist next to the pump, filter and heater.

Give the garage its own round on the calendar: exhaust fans and carbon monoxide detectors tested, trench grates cleared of grit, and in snow country an engineer’s look at slabs and waterproofing that road salt eats into.

Elevators, generators and fire systems are usually under contract, and the contractor’s report is often the only record of what they found. Log each report in FleetZap as a work order on the equipment it covers, with the cost, so the next reserve study or board meeting starts from the real repair history.

Unit leaks, forgotten warranties and annual jobs

  • Unit or common area: A leak starts in one owner’s unit and stains the hallway below, and a year later nobody can show what the association paid to fix.
  • Warranties on new systems: A new roof or boiler comes with a warranty, and an early failure gets paid from the operating budget because nobody remembered it.
  • Once-a-year jobs: Pool closing, irrigation blowout and winterizing the garage drains happen once a year, so whoever does them relearns the steps each time.
  • Generator runs on trust: The emergency generator is supposed to be run on a schedule, and the only proof is a tag on the door.

Owner requests, contractors and board reports

  • Owner requests by link or QR: Owners and staff submit requests with photos from a QR label by the elevator or a link in the newsletter; the manager approves them into work orders.
  • Common-area PM: Schedule elevator, boiler, generator, pool and fire equipment service by calendar.
  • Contractor work and cost: Outside contractor jobs with cost and reference; see each vendor’s spend and turnaround.
  • Inspections and certificates: Fire, elevator and pressure vessel inspections as compliance items with reminders.
  • Lifecycle and replacement: Each system’s purchase date, expected life and repair costs give a replace-or-keep forecast for planning.
  • Reports for the board: Scheduled report emails with maintenance cost, open work and PM compliance, with the CSV attached.

Elevators, garages, pools and generators

  • Elevators
  • Boilers and chillers
  • Parking garage doors and ventilation
  • Emergency generators
  • Fire alarm and sprinkler equipment
  • Pool equipment
  • Roofs
  • Common-area HVAC

Open owner requests and common-area spend

  • Open requests: Boards watch this one; requests open for weeks are often waiting on a contractor, so chase the vendor first.
  • PM compliance: Late generator runs or pool service show up here; the missed generator run is the one the board will ask about.
  • Maintenance cost: Split cost between common areas and unit-related repairs so the board sees what the association paid for each.
  • Overdue inspections: An overdue elevator or fire inspection needs a booked date and a line in the next board report.

Free tools for this

  • OEE calculator: Overall equipment effectiveness from availability, performance and quality
  • MTBF calculator: Mean time between failures, mean time to repair and availability
  • Uptime calculator: Downtime allowed per year, month, week and day at an uptime target, and your actual uptime
  • Break-even calculator: The hours, jobs or rentals needed each month to cover fixed costs

Sources

FleetZap Maintenance

Work orders, PM, parts, compliance, assets and KPIs. Explore FleetZap Maintenance.

Frequently asked questions

Can owners submit requests without an account?

Owners scan a QR label in a common area or open the request link, describe the problem and attach photos, with no sign-in. The manager reviews each request and approves it into a work order, and the request list shows which ones are still waiting for a decision.

Can a property manager handle several condos?

Each building becomes a location with nested floors and areas. Requests, assets, work orders and costs all filter by location, so a manager with several associations can pull up one building’s open work and spend before that board’s meeting without mixing in the others.

Does FleetZap handle fees, votes or owner accounts?

Fees, votes, reserve funds and owner records stay in your association management software. FleetZap holds the repair history and cost of each building system, such as every boiler repair since the last reserve study, so the next study can draw on real figures.

Can we send the board a regular report?

Scheduled report emails go out daily, weekly or monthly with a summary and the full CSV attached. A monthly report on maintenance cost, open work and PM compliance gives the board the same figures at every meeting without the manager building a spreadsheet by hand.

Related

Book a demo · Try the live demo