FleetZap · Features · Solutions · FleetZap Maintenance · FleetZap Rentals · FleetZap Dispatch · FleetZap GPS Tracking · What a CMMS does · GPS tracking & engine hours · Dispatch & route optimization · Rentals module · Industries · Customers · Resources · Free calculators · Free templates · Pricing · Contact

Maintenance software for chemical plants

Updated

FleetZap schedules inspections and service for a chemical plant’s pumps, vessels and relief devices, records readings and signatures on every check and keeps critical spares and permit dates on track.

Mechanical integrity records for relief valves

Chemical plants run pumps, compressors, reactors, vessels, heat exchangers, agitators, valves, relief devices, cooling towers and boilers, along with tank farms and mobile equipment. Much of the work is inspection: vibration and temperature readings, leak checks, relief device tests and pressure vessel inspections on fixed intervals, each needing a clear record.

Most jobs need a safe-work permit and isolation first, and that process runs on paper. Technicians take vibration readings that nobody compares against limits, the spare seal for a critical pump isn’t on hand, and pulling one asset’s history together for an inspector takes a day.

Plants covered by OSHA’s process safety management standard (29 CFR 1910.119) carry mechanical integrity duties for equipment such as pressure vessels, relief systems and pumps. Each inspection and test needs a written record with the date, the inspector’s name, the equipment identifier, a description of the work and the results. Deficiencies outside acceptable limits get corrected before further use or in a safe and timely manner. In FleetZap, each inspection is a procedure with reading steps and limits and a signature step, and a failed reading opens a linked repair. Your engineers set the intervals and the acceptable limits.

Take a relief valve on a reactor. Its procedure opens with the isolation steps, then records the as-found pop pressure from the bench test as a reading step, with the nameplate set pressure and your engineers’ tolerance as the limits. A pass/fail step covers seat leakage and the spring and disc, a photo step captures the tag, and the technician signs. An as-found reading outside the range fails the step, and FleetZap opens a repair linked to that test so the valve is reworked or replaced before it goes back on the vessel. The next test starts with this result already on the valve’s history.

Seal failures, turnaround lists and changed equipment

  • Bad-actor pumps: One pump goes through a mechanical seal every few months, and each failure gets fixed without anyone asking why.
  • Turnaround backlog: Work that needs the unit down piles up between turnarounds, on a list that lives in a planner’s spreadsheet.
  • Relief tests pushed with the turnaround: The turnaround slips two months, the relief valve tests booked for it slip too, and the new due dates live in an email thread instead of on each valve (hypothetical).
  • Changes that miss the PM: A pump gets replaced with a different model, and its schedule, spares and procedure still describe the old one.

Inspections, lockout steps and an audit log

  • Inspection procedures: Pass/fail, reading with min/max, photo and signature steps; a failed step opens one linked repair work order.
  • PM by date or hours: Schedule service for pumps, compressors and vessels by calendar or run hours across a category or list of units.
  • Lockout steps on procedures: Add isolation and lockout steps with headings and help text so every job starts the same way.
  • Permit and inspection reminders: Compliance items for permits, inspections and certifications remind you before they expire and can open the inspection work order.
  • Criticality and spares: Mark assets HIGH, MEDIUM or LOW criticality and keep their spare parts in stock with low-stock alerts.
  • Audit log: Every change is recorded with who made it, when and which fields, and kept for 400 days.

Pumps, reactors, exchangers and relief valves

  • Centrifugal pumps
  • Compressors
  • Reactors and vessels
  • Heat exchangers
  • Agitators and mixers
  • Relief valves
  • Cooling towers
  • Boilers

Overdue inspections and pump failure intervals

  • PM compliance: Filter compliance by HIGH criticality first; a late relief valve test outweighs a late filter change.
  • MTBF: Rank pumps by MTBF; the bottom few are the bad actors worth a root cause review.
  • Overdue inspections: Every overdue relief valve or vessel inspection needs its new date recorded on that asset’s own record.
  • Availability: Availability on spared pumps can look fine while the standby is down; check both units in each pair.

Free tools for this

Sources

FleetZap Maintenance

Work orders, PM, parts, compliance, assets and KPIs. Explore FleetZap Maintenance.

Frequently asked questions

Does FleetZap manage safe-work permits?

FleetZap doesn’t issue safe-work permits; those stay in your permit system. You can add isolation and lockout steps with headings and help text to procedures, so each job starts with the same sequence. Compliance items track operating permits and certifications with reminders before they expire.

Can technicians record readings against limits?

Reading steps have a unit and an allowed range, such as a pump bearing temperature or vibration level. A value outside the range fails the step and opens a repair work order linked to the inspection, and the reading stays on the asset’s history for the next comparison.

Does FleetZap connect to our plant control system?

FleetZap doesn’t read your DCS or plant historian. Technicians enter readings on their checklists, and meter readings can be imported from CSV. Optional GPS trackers can report hours and a few engine signals from mobile equipment such as loaders and forklifts.

Can we see an asset’s full history?

Each asset keeps its work orders, readings, photos, parts used, status changes and downtime in one place. The audit log shows who changed what and when, so you can show an inspector the record for a relief valve or pump without assembling binders.

Related

Book a demo · Try the live demo