FleetZap · Features · Solutions · FleetZap Maintenance · FleetZap Rentals · FleetZap Dispatch · FleetZap GPS Tracking · What a CMMS does · GPS tracking & engine hours · Dispatch & route optimization · Rentals module · Industries · Customers · Resources · Free calculators · Free templates · Pricing · Contact

Maintenance software for pharmaceutical manufacturing

Updated

FleetZap gives pharmaceutical maintenance teams written procedures with readings and signatures, a full history for every piece of equipment and an audit log of who changed what. A reviewer can open one tablet press and see every job, reading and signature recorded against it.

Written procedures and punch tooling under 211.67

Pharmaceutical plants run tablet presses, granulators, blenders, coaters, filling lines, autoclaves, purified-water systems and the HVAC that holds cleanroom pressure and temperature. Most of it is serviced on fixed calendar intervals. Technicians take readings against set limits, and each job has to be written up in enough detail that a quality reviewer can follow it months later.

Many maintenance teams still work from paper logbooks, spreadsheets and binders of procedures. When an auditor asks for a press’s service record, someone spends the afternoon pulling folders. Spares for critical equipment aren’t always on the shelf, and nobody has a plant-wide list of overdue jobs.

In the US, FDA’s current good manufacturing practice rule for finished drugs sets the baseline. Under 21 CFR 211.67, you need written procedures for cleaning and maintaining equipment that assign responsibility, set maintenance and cleaning schedules, and describe the methods in enough detail, including how to take equipment apart and put it back together. Records of maintenance, cleaning and inspection have to be kept. In FleetZap, each schedule carries its procedure, each work order names the assigned technician, and each completed job leaves a dated, signed record. Cleaning and batch records stay in your quality system.

Take a tablet press punch inspection. Set up the tooling set as its own asset, so its history follows it from press to press. The procedure opens with a photo of the punches laid out in station order. Each punch then gets a reading step for working length, with the minimum and maximum from your tooling drawing as its limits, and a pass/fail step for the tip: no pitting, chips or rolled edges, embossing still sharp. A punch that measures short or shows a chipped tip fails its step, and FleetZap opens a repair linked to the inspection so the punch is pulled before the next batch. The technician signs at the end, and the readings for every station stay on the tooling set’s history.

Moving tooling, fixed dates and vendor paperwork

  • Tooling that moves around: Punches, dies and filling-line change parts get swapped between machines, so their wear history drifts away from any one press.
  • Calendar-driven service: Most equipment runs on fixed service dates, and a late PM can mean a deviation report even when the machine runs fine.
  • Gauges between calibrations: A pressure gauge on a granulator can read high for weeks before its calibration date catches it.
  • Contractor reports on paper: A vendor services the autoclave or the water system and leaves a paper report that never reaches the equipment file.

Procedures, signatures and an audit trail

  • Calendar and usage schedules: Preventive maintenance by date or meter, for one asset, a category or a list of units, with the procedure attached.
  • Procedures with readings and signatures: Steps can be pass/fail, a reading with min/max limits, a photo or a drawn signature with the signer’s name; out-of-range readings fail and open a repair.
  • Audit log: Every change in FleetZap is recorded (who, when and which fields) and kept for 400 days, searchable and exportable to CSV.
  • Full equipment history: Each asset keeps its work orders, readings, parts used, downtime and status changes in one place.
  • Critical spares: Parts have reorder points and low-stock alerts; the part picker on a work order lists the asset’s own spares first.
  • Roles and two-step sign-in: Roles limit what technicians can change, and admins can require two-step sign-in for the people who plan and approve work.

Tablet presses, granulators and clean utilities

  • Tablet presses
  • Granulators and blenders
  • Coating pans
  • Filling and packaging lines
  • Autoclaves
  • Purified-water systems
  • Cleanroom HVAC
  • Compressed-air systems

Overdue work and press failure intervals

  • PM compliance: A late PM on a GMP asset may need a deviation report; review this number before each quality meeting.
  • Overdue work: Overdue repairs on presses or filling lines belong in the planner’s daily review, sorted by criticality, before they block a batch.
  • Availability: Low availability on one press can point at tooling or feeder problems; compare it with presses running the same product.
  • MTBF: Shorter time between press failures after a tooling swap means checking the punches and dies that moved in.

Free tools for this

Sources

FleetZap Maintenance

Work orders, PM, parts, compliance, assets and KPIs. Explore FleetZap Maintenance.

Frequently asked questions

Is FleetZap validated for GMP or FDA use?

FleetZap is not sold as a validated system and doesn’t claim compliance with any specific regulation. It provides an audit log, signatures on procedure steps and a complete history for each asset; validating it for your quality system is your responsibility.

What does the audit log record?

Every successful change in FleetZap: who made it, when, the record and which fields changed. It also logs sign-ins and failed sign-ins. Entries are kept for 400 days, and you can search them and export them to CSV when a quality reviewer asks who edited a schedule or closed a work order.

Can technicians sign off on procedures?

A procedure can include signature steps where the technician draws a signature and enters their name. The signature is saved on the work order with the other step answers, readings and photos, so the completed job shows who did the work and who signed it off in one record.

Can we keep the calibration or service history for each instrument?

Each instrument can be an asset with its own date-based schedule and procedure, including reading steps with limits for calibration checks. Every completed job, reading, photo and signature stays on that instrument’s history, and vendor visits can be logged as work orders with their cost and reference number.

Related

Book a demo · Try the live demo