What is breakdown maintenance?
Updated
Breakdown maintenance is repair carried out after a machine has failed or stopped working, rather than before. It is also called reactive or run-to-failure maintenance.
Breakdown maintenance meaning
With breakdown maintenance, nothing gets done until something breaks. The machine runs until it stops or becomes unsafe, and then someone repairs it. It is the oldest approach and needs no planning or schedules.
Some items cost less to replace when they fail than to maintain, and putting them on a run-to-failure list is a decision you make in advance. A shop that spends every day firefighting has made no such decision. Planned work never gets done, and the records show it as a high share of reactive hours.
Chosen, or by default?
Letting a cheap, safe, contained item fail is a fair call, and the run-to-failure guide covers how to pick those items and stock their spares. For breakdown maintenance as a whole, look at where your breakdowns land. If they fall on items nobody chose to run to failure, you’re seeing signs like these:
- A machine fails with a PM that came due and wasn’t done
- The same fault comes back on the same machine after each repair
- Parts that should sit on the shelf arrive by rush freight
- A rental comes in to finish a job after a machine failed mid-shift
The hidden cost of relying on it
Price a breakdown and the repair bill is the easy part. Add the crew’s idle hours, the rush freight on the part, any rental brought in to finish the job, and secondary damage, such as a hose that fails and takes out a pump with it.
Breakdowns also make the shop’s week unpredictable: the team pushes planned work aside to deal with them, and the skipped PMs cause the next round of failures. To see where you stand, measure the share of maintenance hours that went to reactive work. The O&M best-practice guidance PNNL publishes for the federal energy management program gives a typical range of 40 to 60% reactive, under 10% for the best programs and a target of 20 to 30%. Those figures come from building maintenance, so treat them as a rough yardstick for a fleet shop.
Example
A hypothetical skid steer’s drive chain snaps mid-job because it was never checked. The crew waits half a day for a mechanic and a chain, and the contractor rents a replacement to finish the work.
In FleetZap
FleetZap records every breakdown as a repair work order with problem, cause and remedy codes, tracks downtime and its cost in dollars, and reports planned versus reactive work so you can see where breakdowns are coming from.
See also
Free tools for this
- Equipment total cost of ownership calculator: Purchase, financing, fuel, repairs and downtime over a machine’s life, minus resale
- Equipment utilization calculator: Time utilization by hours, rental time utilization and dollar utilization
- Mechanic labor rate calculator: The shop rate per billable hour that covers wages, burden and overhead
- Downtime cost calculator: What an hour of a machine down really costs, per breakdown and per year
Sources
FleetZap Maintenance
Work orders, PM, parts, compliance, assets and KPIs. Explore FleetZap Maintenance.
Frequently asked questions
Is breakdown maintenance the same as corrective maintenance?
They overlap. Breakdown maintenance is repair after a machine has failed. Corrective maintenance is the wider term: it also covers fixing defects found during an inspection or a daily check, before the machine stops. Every breakdown repair is corrective, while a corrective job can be planned days in advance.
Is breakdown maintenance ever a good idea?
For cheap, non-critical items where a failure is safe and damages nothing else, it’s a sound choice, such as a work light on a trailer or a pump with a spare on the shelf. It turns into a problem once it becomes the default for machines that stop a crew or a job when they fail.
How do I reduce breakdown maintenance?
Put your critical machines on preventive schedules first and add daily operator checks so problems get reported early. Record the cause on every repair so repeat failures get a lasting fix. Then track the share of reactive work each month and expect it to fall as planned work takes hold.