What is preventive maintenance?
Updated
Preventive maintenance (PM) is routine service done at planned intervals, by calendar time, engine hours or distance, to lower the chance of a failure instead of waiting for one. Oil changes, greasing, filter swaps and scheduled inspections are the everyday examples, and the interval for each task comes from the manufacturer’s manual and the way you run the machine.
Free tool: Next PM due calculator: When the next service comes due, in hours and on the calendar.
Preventive maintenance meaning
Preventive maintenance means servicing a machine on a set interval, before it shows a problem. Oil and filter changes, greasing, belt and hose inspections, fluid sampling and safety inspections are the everyday PM tasks in an equipment shop.
The U.S. Department of Energy’s O&M Best Practices Guide gives a tighter definition: actions performed on a time- or machine-run-based schedule that detect, preclude or mitigate degradation of a component or system, with the aim of sustaining or extending its useful life. The same guide credits the U.S. Navy with pioneering the approach to keep its vessels reliable.
It works because wear is predictable enough to plan around. A filter changed on schedule, or a cracked hose caught during a service, costs a fraction of the same part failing on a job site, where you also pay for the stranded crew and whatever the failure damages next. PNNL’s guidance for the U.S. Department of Energy cites studies putting the savings of a preventive program at as much as 12% to 18% on average compared with a purely reactive one.
You will see it spelled both ways. “Preventive” and “preventative” mean the same thing; U.S. government guidance, including the DOE guide quoted here, uses preventive.
Types of preventive maintenance
Each PM task carries a trigger that decides when it comes due again. The trigger is what people usually mean when they ask about types of preventive maintenance, and fleets use five.
- Time-based (calendar): every 3 months, every year. Right for tasks that age with time, such as coolant, fire extinguishers, batteries on standby units and the annual inspection on a truck
- Usage-based (meter): every 250 engine hours or 6,000 miles. Right for anything that wears as it works: engine oil, filters, pins and bushings, brakes
- Whichever comes first: hours or months, common for equipment that sits idle for part of the year, so a loader that only ran 90 hours over winter still gets fresh oil
- Seasonal: before winter or before the busy season, such as block heaters and antifreeze strength in the fall or air conditioning and cooling packs in the spring
- Inspection-triggered: a scheduled check measures something (tread depth, brake lining, track sag, an oil sample) and the result decides whether a repair follows. This is where preventive work starts to shade into condition-based maintenance
Preventive maintenance examples by equipment
Intervals come from each manufacturer’s manual, so follow yours. The lists below show what PM covers on common fleet equipment; the numbers in them are typical, and your manual wins wherever it differs.
- Excavators and loaders: greasing pins and bushings, engine oil and filters by engine hours, hydraulic filters and oil samples at longer hour intervals, undercarriage or tire checks
- Trucks and trailers: oil and filters by distance, brake, tire and light inspections, coupling devices, wheel-end bearings, and the periodic inspection federal rules require for commercial motor vehicles
- Generators and compressors: oil and filters by run hours, belts, battery and coolant checks, and load tests on standby units that may only run a few hours a year
- Forklifts and aerial lifts: operator pre-use checks plus scheduled inspections of hydraulics, chains, tires and safety devices
- Mowers and small engines: blade sharpening, air filter cleaning and spark plugs, usually by hours in season and a full service before storage
- Buildings and shop equipment: HVAC filters, air compressor drains, vehicle lift inspections and emergency lighting tests on a calendar
How to set up a preventive maintenance program
A PM program is the list of machines, the tasks for each and the triggers that bring them due, plus the habit of doing the work on time. You can build a first version in a week for a small fleet. The longer guide on starting a PM program covers each step in detail; the short version follows.
- List every machine with its make, model, serial number and current meter reading. A PM plan built on a guessed meter reading comes due on the wrong day
- Rank them by what a failure costs you. Start with the machines that stop a crew or a contract when they go down
- Pull each manufacturer’s service schedule and note the severe-duty intervals if your work is dusty, hot or heavy
- Write each service as a checklist with the parts it uses, so a 500-hour service on one excavator is the same job no matter who does it
- Set the trigger for each task: hours, distance, calendar or whichever comes first
- Decide how meter readings reach the schedule: from operators, from the shop or from GPS trackers
- Track PM compliance every month and review intervals against failure history after a full season
Preventive maintenance schedule and service levels
A preventive maintenance schedule is the calendar that comes out of the plan: which machine is due for which service, and when. Shops with larger fleets group tasks into levels so one visit covers everything due at that point. On trucks this often shows up as PM A, PM B and PM C services; on equipment it is the 250-, 500-, 1,000- and 2,000-hour services listed in the manual.
The bigger services nest the smaller ones. Take a hypothetical excavator whose manual lists engine oil at 500 hours, hydraulic return filters at 1,000 and hydraulic oil at 2,000. At 2,000 hours the technician does all three, so the schedule should open one work order with the combined checklist, and the 500- and 1,000-hour services that also fall due that day should not open as separate jobs.
Give each service a grace window, for example 10% of the interval, and count anything done inside it as on time. A window keeps the schedule realistic for machines out on a job, and it gives you a clear line for when a PM is overdue.
When preventive maintenance is the law
For commercial motor vehicles in the U.S., part of PM is law. 49 CFR 396.3 requires motor carriers to systematically inspect, repair and maintain every vehicle they control, and to record what each vehicle’s upcoming services are and when they fall due. Under 49 CFR 396.17, each commercial motor vehicle must have passed a periodic inspection within the preceding 12 months, with documentation of it on the vehicle. In a tractor and trailer combination, each unit needs its own.
A calendar PM with a 12-month trigger on every truck and trailer stops that inspection from slipping, and the closed work order becomes the inspection record.
Forklifts have a daily rule. OSHA’s standard for powered industrial trucks, 29 CFR 1910.178(q)(7), says a truck must be examined before it is placed in service, at least daily, and after each shift where trucks run around the clock; a truck with a condition that affects safety stays out of service. That daily check sits beside the hour-based services in the manual.
Benefits and limits of preventive maintenance
Done well, PM cuts unplanned downtime, extends machine life, supports warranty claims and gives the shop a workload it can plan a week ahead. The service records also help at resale and in audits, because a buyer or inspector can see each service with its date and meter reading.
It has costs. Service a machine too often and you waste parts and labor, and PNNL lists the potential for incidental damage to components during unneeded maintenance as one of its risks. The DOE guide is also blunt that PM won’t stop catastrophic failures; it lowers how many failures you get. Fleets offset both by pairing PM with condition checks and, on critical machines, predictive methods such as oil analysis.
PNNL’s benchmark table gives a sense of the mix. A typical program spends 40% to 60% of its activity on reactive work and 30% to 50% on preventive. Best-in-class programs keep reactive work under 10%, with 25% to 35% preventive and the rest predictive.
How to measure a PM program
The main number is PM compliance: preventive jobs completed divided by preventive jobs scheduled in the period. The DOE guide reprints a NASA benchmark of more than 90% for this ratio. Below that, services are slipping, and the machines that miss them tend to be the busiest ones.
Watch two more numbers beside it. Planned versus reactive hours show whether PM is reducing breakdowns or only adding work. Repeat failures between services show where an interval is too long or a task is missing from the checklist. The guide on PM compliance explains grace windows and how to count late jobs.
Common PM mistakes
Check your own program for these.
- Calendar intervals on machines whose wear follows hours, so busy units go overdue while idle ones get serviced early
- Stale meter readings: a meter-based PM can only come due on time if someone or something updates the hours
- One plan copied across every model instead of each manufacturer’s intervals
- Counting a PM as done when the work order closes with the checklist half filled in
- Never comparing intervals with failure history, so the same component keeps failing between services
- Letting PM work orders pile up behind repairs until the backlog hides which services are months late
Preventive versus predictive, reactive and TPM
Breakdown (reactive) maintenance waits for failure. Predictive maintenance uses condition data, such as oil samples, vibration or fault codes, to service a machine when a problem starts to show. Preventive sits between them, and for most equipment fleets it is the backbone of the maintenance plan, with predictive methods added where a failure costs the most.
Total productive maintenance (TPM), often searched as “total preventive maintenance”, is a wider program from Japanese manufacturing. It puts operators in charge of basic care such as cleaning, checking and lubricating, and it treats PM as one pillar among several aimed at overall equipment effectiveness. A fleet can run a solid PM program without adopting TPM, and the operator daily check is the piece of TPM most fleets already use.
Example
A hypothetical excavator gets engine oil and filters every 500 hours or 6 months, whichever comes first. At 480 hours a work order opens with the procedure and filter numbers, and the technician does the service before the interval passes. It ran only 300 hours by the 6-month mark the year before, so the calendar trigger had opened that service instead.
In FleetZap
FleetZap runs PM schedules by meter, calendar or whichever comes first, on one machine, a whole category or a picked list. Meter readings come from technicians on the phone app, rental returns or optional GPS trackers. When a unit comes due it opens the work order with the procedure attached, projects upcoming services from real usage, and reports PM compliance and planned versus reactive work.
See also
Free tools for this
- Next PM due calculator: When the next service comes due, in hours and on the calendar
- Downtime cost calculator: What an hour of a machine down really costs, per breakdown and per year
- MTBF calculator: Mean time between failures, mean time to repair and availability
- OEE calculator: Overall equipment effectiveness from availability, performance and quality
Sources
- PNNL for the U.S. DOE Federal Energy Management Program: Maintenance approaches (O&M best practices)
- eCFR, 49 CFR 396.3: Inspection, repair, and maintenance (motor carriers)
- eCFR, 49 CFR 396.17: Periodic inspection
- U.S. DOE Federal Energy Management Program: O&M Best Practices Guide, Release 3.0 (Chapters 3 to 5)
- OSHA 29 CFR 1910.178: Powered industrial trucks
FleetZap Maintenance
Work orders, PM, parts, compliance, assets and KPIs. Explore FleetZap Maintenance.
Frequently asked questions
What is an example of preventive maintenance?
Changing engine oil and filters on a loader every 500 hours, greasing pins daily and the annual inspection on a truck are all preventive maintenance. Each happens because the schedule says so, before anything has failed. A scheduled inspection counts too, even when it finds a worn hose and a repair follows.
What does PM stand for in maintenance?
Preventive maintenance, sometimes written preventative maintenance. Shops also say “a PM” for one scheduled service job, as in “the 500-hour PM is due on the loader”. Some fleets label their service levels, such as PM A and PM B, to tell a short routine service from a larger one at a longer interval.
What are the types of preventive maintenance?
Fleets sort PM by its trigger: time-based tasks on a calendar, usage-based tasks by engine hours or distance, whichever-comes-first tasks that use both, seasonal tasks before winter or the busy season, and scheduled inspections whose results decide whether a repair follows. Most machines need a mix, set from the manufacturer’s manual.
Is preventive maintenance the same as planned maintenance?
Preventive maintenance is one kind of planned maintenance. Planned maintenance covers any work prepared in advance, including a repair booked for next week after an inspection found a worn part. So every PM is planned, while a planned job can also be a repair that has nothing to do with the PM schedule.
How do you measure preventive maintenance?
The usual measure is PM compliance: preventive jobs completed divided by preventive jobs scheduled in the period, as a percentage. The DOE’s O&M Best Practices Guide uses the same completed-over-scheduled ratio, with a benchmark above 90%. Track it by category and by technician, and watch planned versus reactive hours to see whether PM is reducing breakdowns.
How often should preventive maintenance be done?
As often as the manufacturer’s manual says for each task, adjusted for how hard the machine works. Dust, heat and heavy loads often call for shorter intervals, and many manuals list a severe-duty schedule. After a year of records, compare failures with the schedule and tighten the intervals where parts keep failing before their service.
What is the difference between preventive and predictive maintenance?
Preventive maintenance services a machine on a fixed interval whether or not it shows wear. Predictive maintenance measures the machine’s condition, through oil analysis, vibration, temperature or fault codes, and services it when the readings say a problem is starting. Many fleets use preventive schedules for most work and add predictive checks on their costliest machines.
What is total preventive maintenance?
The phrase usually refers to total productive maintenance (TPM), a program from Japanese manufacturing that makes operators responsible for basic care such as cleaning, inspecting and lubricating, alongside planned maintenance by the shop. Its aim is higher overall equipment effectiveness. Preventive maintenance is one part of TPM, and fleets often borrow its operator daily checks.
What does PM due mean?
A preventive maintenance service has reached its trigger: the engine hours, miles or date set in its schedule. PM overdue means it passed that point without being done. Many shops open the work order a little before the due point so parts and a bay are ready.