Reactive maintenance usually costs more over time: fixing equipment only after it breaks looks cheaper up front, but unplanned failures bring extra downtime, rushed parts and secondary damage. Preventive maintenance services machines on a schedule to stop breakdowns happening, in exchange for some planned downtime and parts.
Fixing after the breakdown
Reactive, or run-to-failure, maintenance waits for a problem. A machine breaks on the job, someone calls the shop, and a technician fits the repair in around everything else. Many small fleets start here because there is no schedule to keep. The bill arrives in other places: a crew standing around, a rental to cover the gap, parts shipped overnight, overtime, and damage that spreads, such as a split hydraulic hose that runs the pump dry and takes the pump with it.
Servicing on a schedule
Preventive maintenance services machines at set intervals of hours, miles or time, usually from the manufacturer’s manual. Oil, filters, belts, brakes and inspections get done before the parts fail. You pick the day the machine comes out of service, order parts in advance, and the technician follows a known procedure. You pay up front in shop time and in parts that still had some life left, and you get fewer breakdowns in the middle of a job.
Two items you can leave to fail
A work light on a skid steer is the textbook case. When an LED lamp dies, it damages nothing else, a spare sits on the shelf, and an operator can swap it in a few minutes. Inspecting or replacing it on a schedule would cost more shop time than the lamp is worth, so the daily check simply reports it when it fails.
A trash pump with a second unit in the yard is the other. If it seizes, the crew loads the backup and the job keeps going, and the shop repairs the first pump when it has a free hour. Take away the backup, or put the pump on a job where flooding damages the work, and the answer changes. Write each run-to-failure decision down with its reason, so nobody later assumes a critical machine was left to fail too.
How to shift from reactive to preventive
Start with the machines whose breakdowns hurt most: the ones that stop a job or have no backup. Put their manufacturer intervals into a schedule and keep meter readings current. Track the share of maintenance hours that is planned versus reactive each month, and add the next group of machines once the first group’s services close on time.
Tracking the balance in FleetZap
In FleetZap, every work order has a type (repair, preventive or inspection), so reports show planned versus reactive percentage, PM compliance and backlog over time. Preventive schedules by meter and calendar open work orders automatically with the procedure attached.
Repairs that do happen carry problem, cause and remedy codes and their full cost, including parts, labor and outside repairs. FleetZap tracks downtime in hours and dollars per machine, so you can show management what reactive work costs.
Key takeaways
- Price a breakdown in full: rental cover, overnight freight, overtime and any part the failure took out with it.
- Run-to-failure fits items that are cheap, safe to lose and quick to swap, like a work light with a spare on the shelf or a pump with a backup unit.
- Put the machines with no backup on a schedule first, then add the rest in groups.
- The monthly planned-versus-reactive share shows whether the shift is happening.
Free tools for this
- Next PM due calculator: When the next service comes due, in hours and on the calendar
- OEE calculator: Overall equipment effectiveness from availability, performance and quality
- Uptime calculator: Downtime allowed per year, month, week and day at an uptime target, and your actual uptime
- Equipment total cost of ownership calculator: Purchase, financing, fuel, repairs and downtime over a machine’s life, minus resale
Sources
FleetZap Maintenance
Work orders, PM, parts, compliance, assets and KPIs. Explore FleetZap Maintenance.
Frequently asked questions
Is reactive maintenance ever the right choice?
Yes, for items whose failure is cheap, safe and quick to fix, and damages nothing else. A machine that stops work when it fails belongs on a preventive schedule.
What is a good planned maintenance percentage?
Your equipment and type of work set the right target, so judge the trend. Say a hypothetical shop logged 200 maintenance hours in January, 90 of them planned (45%), and 200 hours in June with 130 planned (65%). If breakdowns fell over the same months, the program is working. If the share stalls, look at which machines are still failing.
Does preventive maintenance eliminate breakdowns?
It cuts them down and makes many of them predictable. A hose can still split a week after its service, and an operator can still miss a warning light. Pair the schedule with daily operator checks and a quick way to report problems from the machine, so whatever slips through reaches the shop while it is still a small repair.
How do I justify preventive maintenance to management?
Price last year’s breakdowns: downtime hours multiplied by what an hour of downtime costs, plus the repair bills, rentals and overtime. Set that beside what the scheduled services would have cost on the same machines. A few months of these numbers per machine gives management something concrete to weigh.