What is a work order?
Updated
A work order is a document, on paper or in software, that authorizes a maintenance job and then records it: the task, the asset, who does it, the due date, and the parts and labor used. Open, it tells a technician what to do; closed, it becomes a line in that machine’s service history.
Work order meaning in maintenance
A work order turns “something needs doing” into a job with an owner. It names the machine, describes the problem or task, sets a priority and says who is responsible. When the technician finishes, the same record holds what was done, how long it took and which parts went in.
Closed work orders are the machine’s maintenance history. They tell you when the hydraulic pump was last replaced, how many times a truck came back for the same fault, and what each machine costs to keep in service. A shop that fills in the opening fields and skips the close-out notes loses all of that.
Outside maintenance the term covers any authorized job: a contractor’s change of scope, a field service visit, a production run in a factory. This page sticks to the maintenance meaning, where one work order equals one job on one asset.
What a work order contains
Formats differ from shop to shop. The fields below cover what a fleet shop needs to run the job today and learn from it later. If you still work on paper, the printable work order template on this site uses the same fields.
- A work order number and title
- The asset (tag, make, model) and its meter reading
- Type (repair, preventive, inspection) and priority
- Description of the problem or task, plus steps or a checklist
- Assigned technician or team and a due date
- Parts used, labor hours and any outside repair cost
- Status, completion notes, photos and the cause of the failure
- Who requested it and who signed it off, so questions later go to the right person
Common types of work orders
Corrective (repair) work orders fix something that has failed or is failing. Preventive work orders come from a schedule, such as an oil change every 250 hours or an annual inspection. Inspection work orders record a check and often lead to a follow-up repair.
Tag every job with its type, because the ratio between them is one of the most useful numbers a shop has. If unplanned repairs take most of the technicians’ hours, machines are failing in the field and preventive work is getting pushed aside. As planned work takes a bigger share, downtime and rush-ordered parts tend to drop with it.
The DOE’s O&M Best Practices Guide lists work orders generated and closed out over time as a core metric, since the trend shows the workload and helps a manager staff the shop. Split by type, the same count shows whether the extra jobs are breakdowns or services.
Beyond those three, most shops add a few types of their own.
- Emergency: a breakdown that stops a crew or creates a hazard, worked ahead of everything else
- Safety: a defect found on a driver or operator check that keeps the unit parked until it is fixed
- Outside vendor: a job sent to a dealer or specialist shop, tracked so their invoice lands on the machine
- Project or install: fitting a new attachment, upfitting a truck or rebuilding a component
- Deferred: a repair the shop agreed to postpone, kept open so it doesn’t disappear
The work order process, step by step
A job passes through the same stages whether it starts as a driver’s complaint or a 250-hour service. The work order process guide goes deeper on each stage.
- Trigger: an operator reports a fault, an inspection item fails or a preventive schedule comes due
- Review: a supervisor checks the request, merges duplicates and decides whether it becomes a job
- Plan: add steps or a checklist, set aside parts and estimate the hours
- Assign and schedule: pick the technician or team and a day when the machine is free
- Do the work: the technician logs time and parts and adds photos
- Close out: record the cause and the fix, update the meter and put the machine back in service
- Learn from it: closed jobs feed cost per machine, backlog and repeat-failure reports
Work order priorities and statuses
Priority decides the order of work, and a short scale gets used more honestly than a long one. Many shops run four levels: critical (safety risk or a stopped crew, start now), high (this shift or today), medium (this week) and low (when a technician is free or the machine is next in the shop). Write down what each level means, or every job ends up marked urgent.
Status says where the job stands. A workable set is open, assigned, in progress, on hold, waiting for parts and done. The “on hold” and “waiting for parts” states matter most, because they separate jobs nobody has touched from jobs that are stuck, and the second group usually needs a purchase order or a phone call.
Reading the open work order list
The open work orders together are your backlog. Count it in estimated labor hours and divide by the hours your technicians have in a week, and you get the backlog in crew-weeks: a hypothetical shop with 120 open hours and three technicians at 35 available hours each carries a bit over one week of work. The maintenance backlog guide covers what a healthy range looks like.
Age matters as much as size. Sort open orders by the date they were created and look at anything older than a month. Some are waiting on parts, some were deferred on purpose, and some are duplicates or jobs already done that nobody closed. A monthly clean-out of those keeps the list accurate enough for technicians to work from.
How to write a good work order
A technician should be able to start the job from the work order alone. These habits get you there.
- Title it with the symptom and the location on the machine: “Hydraulic leak, left boom cylinder” beats “Excavator broken”
- Describe what the operator saw and when, and leave the diagnosis to the technician
- Keep one job per work order. Two unrelated faults on one truck get two orders, so each cost and cause stays clean
- Attach photos, the meter reading and the procedure or checklist if one exists
- Note the energy sources to isolate when the job needs lockout. OSHA’s 29 CFR 1910.147 requires documented energy control procedures for servicing machines that could start up or release stored energy
- Close with the cause as well as the fix, in words the next person will understand
Work orders as DOT records for trucks
If you run commercial motor vehicles in the U.S., your work orders double as compliance records. 49 CFR 396.3 requires motor carriers to keep, for each vehicle they control for 30 consecutive days, a means of showing the nature and due date of its inspection and maintenance operations, plus a record of inspections, repairs and maintenance with their date and nature. Those records stay where the vehicle is housed or maintained for 1 year, and for 6 months after the vehicle leaves your control.
Driver inspection reports connect here too. Under 49 CFR 396.11, a defect on a driver vehicle inspection report that would likely affect safe operation has to be repaired before the vehicle runs again, and the carrier certifies on the report that the repair was made or was unnecessary. Drivers only have to file a report when they find a defect, and the carrier keeps the report and certification for three months. A repair work order opened from that defect and closed with the fix written down gives you the paper trail.
Paper work orders versus work order software
Paper work orders work for one technician and a handful of machines. They break down when you need to answer questions across many jobs: what did this loader cost last year, which jobs are waiting for parts, how many services are overdue. Someone has to read every sheet to find out.
Work order software, usually part of a CMMS, keeps each order linked to the asset, the parts stock and the technician’s time, so those answers come from a filter. The DOE guide lists shortest, median and longest time to close a work order by component among the reports a CMMS can produce, which nobody calculates by hand from a filing cabinet.
Work order versus work request and purchase order
A work request is someone asking for work, such as an operator reporting a leak. A work order is the approved, assigned job. Most shops review requests first and convert the valid ones, so the backlog holds real, prioritized work and three reports of the same leak become one job.
A purchase order buys parts or outside services from a supplier. A repair order or service order is the name dealers and repair shops use for a work order on a customer’s vehicle, and it usually ends in an invoice to that customer.
Example
An operator reports that a hypothetical excavator, EX-205, is leaking hydraulic oil. The shop opens work order #7512, marks it high priority, assigns a technician and sets it due tomorrow. The technician finds the hose has worn through, sets the job to waiting for parts while the hose is fetched from stock, then fits it. At close-out it records a replaced hose, 1.5 hours of labor and the cause: the hose was rubbing against the boom, so a clamp went on as well.
In FleetZap
In FleetZap every job is a work order with a number, type, priority, assignee or team, due date, steps, photos, parts issued from inventory, labor timers, outside-vendor cost and problem, cause and remedy codes. Requests from QR labels are approved into work orders with one click, preventive schedules open their own, and a failed inspection item creates a linked repair job. Technicians work them on their phones, each closed job joins the machine’s history, and billable work can become an invoice that syncs to QuickBooks Online.
See also
Free tools for this
- Uptime calculator: Downtime allowed per year, month, week and day at an uptime target, and your actual uptime
- Equipment total cost of ownership calculator: Purchase, financing, fuel, repairs and downtime over a machine’s life, minus resale
- Equipment utilization calculator: Time utilization by hours, rental time utilization and dollar utilization
- Mechanic labor rate calculator: The shop rate per billable hour that covers wages, burden and overhead
Sources
FleetZap Maintenance
Work orders, PM, parts, compliance, assets and KPIs. Explore FleetZap Maintenance.
Frequently asked questions
What is the purpose of a work order?
A work order authorizes a maintenance job and tracks it from request to close-out. It tells the technician what to do and on which machine, and it records who did the work, which parts went in, how long it took and what it cost. Over time those closed orders become each machine’s service history.
Who creates a work order?
A maintenance manager, planner, dispatcher or technician, depending on the shop. Preventive work orders are usually generated by the schedule when a meter reading or date comes due. Operator and driver requests become work orders once a supervisor approves them, which keeps duplicates and non-issues out of the backlog.
Is a work order the same as a job card?
Mostly, yes. “Job card”, “job sheet”, “repair order” and “service order” are names different shops use for the same document: a record that authorizes a job and captures the labor and parts that went into it. The layout changes from one shop to the next, while the purpose and the core fields stay the same.
What should be on a work order?
At minimum: a work order number, the asset and its meter reading, the type and priority, a description of the task, who is assigned and the due date. When the job closes, add the parts used, labor hours, outside costs and the cause of the failure. Without those closing fields you can’t work out cost per machine or spot repeat failures.
What is the difference between a work order and a purchase order?
A work order authorizes labor on a machine. A purchase order authorizes buying parts or services from a supplier. The two often meet: a repair needs a part that isn’t on the shelf, so the shop raises a purchase order, receives the part into inventory and then issues it to the work order, where its cost lands on the machine.
What are the types of work orders?
The main types are corrective (repair), preventive (from a schedule) and inspection. Shops often add emergency for breakdowns that stop work, safety for defects that park a vehicle, outside vendor for jobs sent to a dealer, and project for installs or rebuilds. Tagging each job with its type lets you compare planned and unplanned work.
What is a work order number?
A work order number is the unique ID a shop gives each job so it can be found, quoted and audited later. Most software assigns it in sequence, such as 7512, sometimes with a prefix for the site or type. Technicians write it on parts tags and invoices, which ties every cost back to the right job and machine.
What is work order management?
Work order management is the routine of taking jobs from request to close-out: reviewing requests, setting priority, assigning technicians, tracking status, issuing parts and recording the result. Small shops do it on paper or a whiteboard. Larger ones use work order software or a CMMS, which keeps every job linked to the machine, the parts stock and the cost.